http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
정양근,이갑복,방선영,김성민,이은미,Chung Yang-Geun,Lee Gab-Bock,Bang Sun-Young,Kim Sung-Min,Lee Eun-Mi 한국방사성폐기물학회 2005 방사성폐기물학회지 Vol.3 No.4
The strong protection method of radiation emergency preparedness is the evacuation when a great deal of radionuclide material is released to environment. Required factors for evacuation time estimate of Ulchin nuclear power plant site were investigated. The traffic capacity and the traffic volume by season were investigated for the traffic analysis and simulation within EPZ of Ulchin site. As a result, the background traffic volume by season were established. The NETSIM code was applied to simulate for 12 scenarios in the event of normal traffic/summer peak traffic/winter peak traffic, daytime/night, and normal weather/adverse weather conditions. The results showed that the evacuation time required for total vehicles to move out from EPZ took generally $210\~315$ minutes. The evacuation time took longer about 45 minutes at night than in the daytime, and 45 minutes in adverse weather than normal condition.