RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제
      • 좁혀본 항목 보기순서

        • 원문유무
        • 원문제공처
        • 학술지명
        • 주제분류
        • 발행연도
          펼치기
        • 작성언어
        • 저자
          펼치기

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • 연속압출공법(ILM)을 이용한 수저(水底)터널공법에 관한 연구

        정병률(Byung-Ryul Jung),류동훈(Dong-Hun Ryu),김준모(Joon-Mo Kim) 한국철도학회 2009 한국철도학회 학술발표대회논문집 Vol.2009 No.5월

        We know the several construction methods for underwater tunnel, but properly submerged concrete box type tunnel was mostly good structure stability and mostly shot length of tunnels. Submerged box type tunnel was buildup the unit segments in dry dock or ship yard by 10 to 20meters. The submerged box was composed with segments was join each together. It was installing the gate and waterproofing the coupling the front hull of a box. The complete submerged box rise up to the surface water, tow in the submerged box by tugboat, going to the destination of tunnel construction site. Beforehand dredge up soil at the bottom of a underwater, sinking the submerged box, connection together complete submerged box in underwater. The research and development ILM tunneling method is receiving careful study. Biggest weakness in submerged concrete box type tunnel was pressure waterproofing, box to box connecting, complete submerged boxes navigation and installation, after operation the submerged tunnel and management concrete box structure. It was positive evidence in submerged concrete box type tunnel. We make a practical application of the principle “the ILM tunneling method in underwater construction methods.”

      • TMG 공법에 의한 터널보강효과

        손재호(Jaeho Son),정병률(Byungryul Jung),최춘식(Choonsik Choi),고태훈(Taehoon Koh) 한국철도학회 2014 한국철도학회 학술발표대회논문집 Vol.2014 No.5

        기존 터널 보강공법인 강관보강그라우팅 공법은 천공된 홀 내부에 존재하는 잔류공기로 인해 그라우트재가 밀실하게 충전되지 못해 보강이 불량하게 되는 경우가 있다. 이를 개선하기 위해 개발된 TMG 공법은 Air discharge tube 를 이용하여 잔류공기를 제거하고 그라우트재의 밀실충전이 가능한 공법이다. 본 공법의 현장실험을 통해 그라우트 재료가 천공홀 주변 미세공극까지 침투되어 주변지반을 균질하게 고결시킬 수 있음을 확인하였다. 따라서 TMG 공법은 터널 시공시 안정성 확보에 유리하고 환경 친화적인 차수 및 지반보강의 목적으로 폭넓게 적용될 수 있을 것으로 기대된다. The small and large caliber steel pipe reinforcement grouting of tunnel top cannot densely fill grout materials into the boring hall because of the residual air inside boring hall. On the other hand, TMG method eliminates residual air by using an air discharge tube, and enables to densely fill the grouting material in the boring hall. Field test showed that this method penetrated the grout materials into the micropore around the boring hall, and led to the uniform ground improvement. Therefore, this method hopes to be applied to the tunnel for the purpose of eco-friendly waterproof and ground improvement.

      • 공항철도 구간 KTX투입 방안 고찰

        김도헌(Do-Heon Kim),정병률(Byung-Ryul Jung),나상주(Sang-Ju Rha) 한국철도학회 2011 한국철도학회 학술발표대회논문집 Vol.2011 No.10

        시대적 요구에 따라 인천공항철도가 1단계(인천국제공항~김포공항 40.3km 07년 3월 개통)와 2단계 (김포공항~서울역 20.7km 10년 10월 개통)가 단계별로 개통되었으나 표정속도의 저하로 도로교통 과 경쟁력을 확보하지 못하고 수송수요의 저조 등으로 이어져 민간협약에 의한 정부 재정지원은 날로 늘어나 결국 2009년11월 국가에서는 한국철도공사로 하여금 민간지분을 매입하여 정부보조금 지출 축 소를 모색하였으나 정부보조금 지출 비중만 축소되었을 뿐 공항철도를 운행함에 따른 정부보조금은 상 당분 지출되고 있는 상황이다. 더우기 2004년 4월 경부고속철도 개통에 따라 고객들도 시간가치의 소 중함을 인식하고 대기시간이 길어지거나 운행시간이 길어지는 경우엔 더 빠른 교통수단으로 전환하는 것을 당연시 하고 있으며 교통정보 전달의 가속화로 출발부터 목적지 도착까지 최적의 교통수단이 무 엇인지 파악 후 출발하므로서 여행에 따른 시간손실을 최소화 하려한다. 따라서 공항철도의 고속화는 이 시대의 요구사항으로 당연시 되어 있고 공항철도의 고속화야 말로 타교통수단과의 경쟁에서 우위를 차 지할 수 있으며 인천공항철도 활성화가 가능하고 소외된 경기서북부 및 인천지역의 고속철도 수혜를 확 대하는 방안일 것이다. 공항철도 고속화방안은 앞선 검토 자료를 기초로 실제 적용하는데 있어 좀더 구체적이고 현실적인 방안 을 모색하고자 본 고에서는 공항철도구간의 고속화 가능구간과 노반 궤도 시스템개량에 따른 열차속도향 상 효과를 분석하고 각 차량별 즉 기존 AREX(120km/h) KTX(230km/h) 180km/h급 고속EMU (Electric Multiple Unit) 등의 차량투입에 따른 열차운행 대안을 분석하고 가장 효율적인 열차운전시격 및 열차운행패턴 등을 제시하여 인천공항철도를 이용하는 고객들에게 좀 더 신속하고 쾌적한 운송수단이 되어 새로운 수송수요 창출은 물론이고 타교통과의 경쟁우위를 확보하여 공항철도가 활성화되기를 기대해 본다. According to the demands of the times Inchon international airport railroad opened up step by step but It is situation that much government subsidies are paid because It does not competitive power with road traffic by decline of schedule speed. Inchon international airport railroad users will convert by other transportation and minimize damage their time as travel time is prolonged. Therefore need high speedization of airport railroad this may act big role competitive power security as well as airport railroad activation with another public transportation. Thus this paper suggests that a high speedization possibility section in the sections of airport railroad and train speed elevation effect analysis by roadbed railroad system improvement and the most efficient operation intervals analyzing each vehicles (AREX (120km/h) KTX (230km/h) EMU(Electric Multiple Unit 180km/h) train running pattern.

      • 고속화에 따른 철도터널의 단면규모 결정요소에 대한 고찰 (A Study on the Principal Factors of Rail Tunnel Cross-Section Design due to High Speed)

        류동훈,이현정(Hyeon-Jeong Lee),한상연(Sang-Yeon Han),신현일(Hyon-Il Shin),정병률(Byung-Ryul Jung),송충렬(Chung-Ryul Song) 한국철도학회 2011 한국철도학회 학술발표대회논문집 Vol.2011 No.5

        Recently, fast-growing up railway transportations. Because, regional traffic congestion problem solving and a period of rapid expansion to meet the demand of industries. In addition the government also suggest to new paradigm for the future ’Low Carbon, Green Growth’ is presented as a new national vision. To meet the social needs and the time demands, Last of the railway increase very long tunnels and huge deep tunnels. Especially this trend accelerated high speed up in the tunnel, the revision of design criteria and research challenges are being actively improved. Mainly in the tunnel cross-section was under the control of the vehicle train speed 150km/hr by the construction of the vehicle cross-section of the tunnel. More than 200km/hr rail tunnel depending on the vehicle’s speed caused the tunnel to the pressure fluctuations will be governed by the aerodynamic changes. Considering the economy to ensure the optimum cross-section of the railway tunnel to the description scheme is selected cross-section of the railway tunnel to determine the size domestic or international railway tunnel for the elements((based on fast Algorithm design criteria, the center line spacing, streetcar line, cross-sectional shape, sectoral issues, such as interface and aerodynamics) based on design practices and to review results. In this study, to propose guidelines depending on the size of a railway tunnel cross section for the size of the determining reasonable factors when designing the railway tunnel and cost-effective standards guidelines.

      • 활성화된 금속 분말의 제조 방법에 대한 소고

        맹주양,정병률,손지환,채민경 순천향대학교 기초과학연구소 1997 순천향자연과학연구 논문집 Vol.3 No.2

        The Most powerful tools in the snthetic organic chemists arsenal are organometallic compounds and metal mediated transformations. Organometallic reagent has its own characteristic chemo, regio, or strereoselectivity. We reported a general approch for highly reactive meatl powder by reducing metal salt in tetrahydrofuran solvents using lithium as reducing agents. The metal salt to reduced must be partially soluble in the solvent and reductions are carried out under an argon atomosphrer. The reductions are exothermic and generally are complete within a few hours. The reductions generated a Finely divided black powder. particle size analyses indicate a range og sizes from one to two microns to submicron range depending on the metal and, more importantly, on the method of preparation. It should be pointed out that particle size analyses as wellas surface area stuies have been done the metals that been collected, dried, and analysis. Scanning electron microscopy(SEM) photographs reveal a range frommaterial to polycrysalline metals.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼