http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
진규남,이정민,김영진,박재현,조계춘,Jin, Kyu-Nam,Lee, Jung-Min,Kim, Young-Jin,Park, Jae-Hyeon,Cho, Gye-Chun 한국토지주택공사 토지주택연구원 2012 LHI journal of land, housing, and urban affairs Vol.3 No.1
For the design of underpass structures, -1.0m(G.L) ground water level guideline for the design of railway, subway, utility tunnel etc, is still being used in Korea. As a result, the underpass structure can be forced by buoyancy, and therefore the in-situ buoyancy anchor method is usually being applied to prevent the uplifting force. For the Yeongjongdo sky city project, the drainage method was applied to remove the buoyancy force. In this study we estimate the efficiency and safety of the applied design and propose the detailed guidelines for standard design and maintenance of the guided drainage technique. Especially, the auxiliary pumping well was operated to maintain the ground water level around the underpass. In the study site, the applied guided drainage method has advantages in both engineering and economic aspects. 현재 지하차도 설계 지하수위는 철도, 지하철 및 공동구의 설계기준과 기존사례를 준용하여 지표면 이하 1.0m를 기준으로 설계하고 있으며, 대부분 과다설계 요인과 친환경적이지 못하다는 지적받고 있는 부력방지 앵커공법이 모든 현장에 획일적으로 적용되고 있다. 본 연구에서는 영종하늘도시 사업지구에 시공중인 지하차도 구조물과 관련하여 국내외 지하차도 설계, 유지관리 현황을 조사하고 지하수 유도배수계획의 현장 적용성을 검토하여 지하차도 유도배수공법의최적 설계방안 및 유지관리 가이드라인을 제시하고자 하였다. 특히, 본 연구유역을 중심으로한 유출지하수에 대한 대체수자원 활용방안 등은 향후 지하차도 부력방지공법의 가이드라인으로 매우 유용하게 활용될 수 있을 것으로 판단된다.
VE/LCC 분석을 통한 공동구 수용시설물의 최적 대안 결정 기법
심영종,진규남,오원준,조중연,Sim, oung-Jong,Jin, Kyu-Nam,Oh, Won-Joon,Cho, Choong-Yeun 한국터널지하공간학회 2018 한국터널지하공간학회논문집 Vol.20 No.2
기존의 공동구에 관한 연구에서는 공동구 내부의 수용시설물들의 최적설계 및 타당성 분석 보다는 공동구 설치와 관련된 전반적인 사항에 대하여 검토 하였다. 공동구 도입과 관련된 기본계획 단계에서의 관련 지표 및 자료 등의 부족으로 수용시설물을 결정하기가 어려운 한계점을 해결하고자, 본 논문에서는 공동구 내 수용시설물의 최적 대안 결정을 위하여 VE/LCC 분석 방법을 제시하였다. 개별 수용시설물의 항목에 대한 분석 및 LCC 비용에 대한 가치지수를 종별 대안에 적용하여 검토 하였으며, 각 종별 우선순위를 분석하였다. 또한, 국내 공동구와 각 종별 시설물의 분석된 결과를 비교하였으며, 본 연구의 결과는 공동구의 도입 시에 최초 설계자를 포함한 사용자들이 수용시설물을 결정하는 과정에서 소요되는 시간을 단축하고 편의성을 높이는데 도움이 될 것으로 판단된다. The study on the existing multi-utility tunnel has examined the general aspects related to the installation of multi-utility tunnel rather than the optimal design and feasibility analysis of accommodation facility in multi-utility tunnel. In the basic planning stage related to the introduction of multi-utility tunnel, it is difficult to determine accommodation facility due to lack of relevant indicators and data. In this paper, VE/LCC analysis method is suggested for the optimal alternative decision of accommodation facilities in multi-utility tunnel. The analysis of the items of individual accommodation facility and the value index for LCC costs were applied to the kind alternatives, and the priorities of each kind were analyzed. In addition, the domestic multi-utility tunnel and analysis result are compared. The result of this study will be helpful to shorten the time and convenience of the user in the process of determining accommodation facility including the first designers when introducing multi-utility tunnel.
UPRS 공법과 프론트잭킹 공법의 파이프루프 주변 현장토압 계측결과 비교
심영종,진규남,송기일,Sim, Youngjong,Jin, Kyu-Nam,Song, Ki-Il 한국터널지하공간학회 2015 한국터널지하공간학회논문집 Vol.17 No.5
본 연구의 목적은 비개착공으로 시공되고 있는 지하차도를 대상으로 지하차도 상부 및 측벽에 작용하는 토압을 계측하여 압입된 강관에 의한 지보효과 확인을 목적으로 하고 있다. 근래의 비개착공법은 파이프루프를 형성하기 위한 강관을 압입한 후 강관과 강관사이를 철근으로 보강하고 모르타르를 타설하는 방식으로 침하에 대한 안정성을 보다 확보하기 위한 노력을 기울이고 있다. 이에 최근 적용되고 있는 UPRS(Upgraded Pipe Roof Structure)공법과 프론트잭킹(Front-Jacking)을 중심으로 강관 압입 후 강관에 의한 토압감소효과를 확인하기 위하여 지하차도 주변의 토압을 계측하였다. 그 결과 UPRS공법의 경우 지하차도에 토압이 상당부분 감소하여 강관보강에 의한 지보강성 효과가 발휘되는 것으로 분석되었다. 프론트잭킹 공법의 경우 지하차도 구조물이 외부에서 제작되어 압입되는 형식으로 강관을 보강시킬 필요가 없기 때문에 강관보강에 의한 토압감소효과는 예측한대로 발휘되지 않는 것으로 분석되었다. This study is to confirm the effect of pre-installed pipe-roof by measuring earth pressure acting on the underpass. In recently developed trenchless methods pre-inserted steel pipes before ground excavation to form pipe-roof are connected each other with re-bars and filled with mortar. In this study, focusing on the Upgraded Pipe Roof Structure method (UPRS) and Front-Jacking, earth pressure around pipe-roof is measured after insertion of steel pipe to ensure the effect of earth pressure reduction. In case of the UPRS earth pressure is considerably reduced because of the reinforced effect of pipe-roof. In case of the Front-Jacking in which the whole underpass structure is pushed into the ground, earth pressure is not reduced as expected, because the pre-installed pipes are not needed to be reinforced.
Consideration of Junction Strength Evaluation of Geogrids
전한용,진규남,Jin Yuanchun 한국토목섬유학회 2006 한국토목섬유학회 학술발표회 Vol.2006 No.12
현재 지오그리드의 접점강도는 GRI GG-2의 시험법에 의해 평가되고 있는데 이 시험법은 단일접점에 대한 평가만을 실시하므로 시편의 치수효과를 고려할 수 없는 단점을 갖고 있다. 즉, T-형태의 단일접점을 갖는 시편을 이용하여 단일 접점강도를 접점수에 대한 접점강도의 선형성을 가정하여 환산하는 방법이므로 제품의 종류에 따른 편차와 편향을 보이므로 타당하고 합리적인 공학적 결과를 도출한다고 볼 수 없다. 따라서 본 연구를 통해서 모든 형태의 지오그리드 보강재에 대해 포괄적인 적용이 가능 하며 결과값이 합리적이고 수용할 수 있는 방법으로 지오그리드의 다접점강도 산출방법을 개발하고자한다.