http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
개략공사비 산출을 위한 공사비 지수 연구 : 1970-1999
남송현,박형근 대한토목학회 2020 대한토목학회논문집 Vol.40 No.5
A significant factor in construction work is cost. At early- and advanced-stage design, costs should be calculated to derive realistic cost estimates according to unit price calculation. Based on these estimates, the economic feasibility of construction work is assessed, and whether to proceed is determined. Through the Korea Institute of Civil Engineering and Building Technology, the construction cost index has been calculated by indirect methods after both the producer price index and construction market labor have been reprocessed to easily adjust the price changes of construction costs in Korea, and the Institute has announced it since 2004. As of January 2000, however, the construction cost index was released, and this has a time constraint on the correction and use of past construction cost data to the present moment. Variables were calculated to compute a rough construction cost that utilized past construction costs through surveys of the producer price index and the construction market labor force consisting of the construction cost index. After significant independent variables among the many variables were selected through correlation analysis, the construction cost indexfrom 1970 to 1999 was calculated and presented through multiple regression analysis. This study therefore has prominent significance in terms of proposing a method of calculating rough construction costs that utilize construction costs that pre-date the 2000s 건설공사를 진행하는데 있어 중요한 요소 중 하나는 가격이다. 정확한 예정가격을 산정하기 위해 기본 및 세부 설계 단계에는 단가산출에 따라 가격을 산정하고 이를 토대로 건설공사의 경제성을 평가하고 진행여부를 판단한다. 국내에서는 건설공사비 가격변동을 손쉽게 조정할 수 있도록 건설연구원을 통해 건설공사비 지수를 산정하여 2004년부터 발표하고 있다. 그러나 2000년도 1월부터 지수가 산정되어 지수 발표 이전 시기의 건설공사비 자료를 사용하지 못하는 실정이다. 과거 공사비를 이용한 개략공사비 산출을 위해 건설공사비 지수를 구성하는 생산자 물가지수와 건설업 시중노임 조사를 통해 변인들을 산정하였다. 다수의 변인 중 상관분석을 통해 유의한 독립변수를 선정 후 다중회귀분석을 통해 1970년도부터 1999년까지의 건설공사비 지수를 산정하여 제시하였다. 본 연구는 2000년대 이전의 과거 공사비를 활용한 개략공사비 산정방법을 제시한 부분에 중요한 의의를 가진다.
남송현,서세덕,박형근 대한토목학회 2017 대한토목학회논문집 Vol.37 No.5
The Republic of Korea has achieved rapid growth in economic, cultural and social through the development policy over the pasthalf-century. However, principle of the nodal system has made an overgrown city and underdeveloped regions. A range of policies have been introduced aimed at underdeveloped regions. But many problems were found in policies. Because government ministry and public services were many and various. In addition, development priority are not based on objective index, Distribution business for the local government have been carried out. A study of the Index selection of the existing regions, has been large-scale center analysis. Thus, the difficulty is often in selecting the priorities of small unit operations. It is difficult to reach a selection of business to region priorities. Accordingly I want to be used as material for the efficient development of rural areas through the selection of indicators for a small areas. Intend to use the decision support system for the efficient development of small underdeveloped areas through index selection for a small and underdeveloped regions. 대한민국은 지난 반세기간 성장위주의 정책을 통하여서 경제적, 문화적, 사회적으로 급속한 발전을 이루었다. 하지만 거점개발방식으로 인하여서 비대한 도시와 낙후된 지역이 생겼다. 이에 따라서 국가에서는 많은 낙후지역 개발정책들을 펼쳐왔으나 많은 문제점들을 가졌다. 그 이유는 소관 부처가 많고 사업의 종류가 다양함으로 인해 나타난다. 또한 개발 우선순위가 객관적인 지표에 근거하지 않고 각 지자체에 분배 식으로 사업이 수행되는 형태이기 때문이다. 기존의 연구된 지역에 대한 지표연구는 도 또는 시, 군등 대단위에서만 분석되어있고 소단위 지역의 사업의 순서를 선정하는데 어려움을 가진다. 이에 따라서 지역에 대한 지표선정을 통해 소규모 낙후지역의 효율적인 개발을 위한 의사결정 지원 시스템로 사용하고자 한다.