http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
金起喆,金癸煥 전북대학교 농업과학기술연구소 1990 農大論文集 Vol.21 No.-
New varieties of Castaneo crenta S, et Z. and their parent trees were investigated in tree shape, flowering habit, leaf and nut characteristics. Selected new varieties, Kwangun, Chuok, Idae, Pyonggi, Unsan, and their parents Gwangjujoyul, Oggwang, Rihei, Ibilki, Sandae, Ginyose were included in the study. 1. Tree shape was all horizontal type in selected new varieties and their parent trees except Chuok, but only Chuok grew into vertical shape. Varieties such as Kwangun, Chuok, Idae, Pyonggi, Uns;En, Rihei, Ginyose, Sandae and Ibuki grew vigorously, while the others showed less vigor. Branch density was very high in Idae, Chuok and Ginyose. 2. Idae exhibited the earliest flowering time, 8th of June for female flowers and 11th of June for male flowers. Among parent tree varieties, Gwangjujoyul flowered first around 11th of, June in male and female flowers. 3. Length of male catkin was 10~23cm of new varieties while 7~ 18cm for their parent trees. 4. Band Patterns for LAP and EST isozyme analyses resulted 5 bands of L1, L2, L3, L4, and L5, for LAP gene and 5 bands of E1,E2, E3, E4, and E5 for EST gene. 5. LAP and EST isozyme analyses made it possible to identify 8 varieties such as Ibuki, Rihei, Ginyose,Kwangun, Unsan, Chuok, Idac, Pyonggi, while three varieties Oggwang, Sandae, Gwangjujoyul could not be identified from the analyses.
이재인,김억,김기철 대한건축학회 2004 대한건축학회논문집 Vol.20 No.8
It is prescribed in the provision of Article 2 of Architects Regulation that the definition of "Field Administration" is: to supervise and affirm whether the building, architectural equipment, or structure is being constructed in accordance with contract documents to guide and direct quality and progress of work, and its safety management. Since the "Provision of Architects Regulation" was enacted in 1962, it has been compulsory to conduct field administration for any building of certain size by a qualified licensed architect to affirm whether the building was constructed in accordance within the legal parameters of the contract documents. However, the intention of the above legislation has become nominal since the government mitigated provisions for duties and requirements of construction engineers, construction progress and safety in October 1998. There have been constant disputes among many parties since the limitation of responsibility for field administration was never clearly established legally even after the enactment of provisions on field administration. The objective of this study is to build transparency in the construction process by clarifying the limit and extent of field administration. I hope that this study can establish a basis to promote national competitiveness in the construction industry.