http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
천연가스·지역난방 수요관리 투자사업의 회피비용 산정기법 개발 및 적용
최봉하,박상용,이덕기,박수억 대한산업공학회 2007 산업공학 Vol.20 No.3
This paper proposed the calculation method of the avoided cost for natural gas and district heating DSM programs. And the proposed method is applied to real DSM programs. The avoided cost for natural gas consists of commodity avoided cost, supply equipment avoided cost, storage equipment avoided cost, and electric power avoided cost. In case of the district heating, avoided cost consists of heat generation equipment avoided cost, heat energy avoided cost, environment avoided cost, and electric power avoided cost. This method can be used to evaluate the benefit of DSM programs quantitatively in cost. Therefore, this method can contribute to make the cost-effectiveness evaluation system and to operate the DSM programs for natural gas and district heating effectively.
최봉하,박상용,이덕기,박수억 한국경영학회 2007 한국경영학회 통합학술발표논문집 Vol.2007 No.8
본 논문은 천연가스와 지역난방 분야에서 시행되고 있는 수요관리 투자사업의 편익 중 가장 대표적 지표인 회피비용의 산정 방법론을 제안하였다. 이와 함께 제안된 방법론을 이용하여 수요관리 투자 사업별 회피비용을 산출하는 사례연구를 수행하였다. 본 방법론 개발의 목적은 아직까지 체계적으로 구축되지 못한 천연가스와 지역난방분야의 수요관리 투자사업에 대한 편익을 비용효과 측면에서 계량화하기 위해 수행되었다. 본 연구결과에서 제시된 방법론을 바탕으로 수요관리 투자사업의 효과를 계량화할 수 있는 계기를 마련할 수 있을 것이며 이는 투자사업의 생산성 및 효과성을 극대화할 수 있을 것으로 기대된다.
최봉하(Choi, Bong-Ha),박수억(Park, Soo-Uk),이덕기(Lee, Deok-Ki) 한국신재생에너지학회 2007 한국신재생에너지학회 학술대회논문집 Vol.2007 No.06
This paper analyses the environmental effect of 100kw PV system installed in Tibet using Life Cycle Assessment(LCA). Then, energy payback time(EPT) and life-cycle CO₂ emission rate are estimated based on life-cycle of the PV system. As a result of the estimation, 6 year of EPT and 20 g-C/kWh of CO₂ emission rate are obtained. In China, average CO₂ emission rate of fossil fuel power generation plant is 260 g-C/kWh. This shows that PV system would be very promising for global environmental issues. For advanced LCA, we need to collect detailed and various data about raw material of PV system.
최봉하(Choi, Bongha),이성곤(Lee, Seonggon),홍성준(Hong, Seongjun),구기관(Koo, Kikwan),이덕기(Lee, Deokki),박수억(Park, Su-Uk) 한국신재생에너지학회 2010 한국신재생에너지학회 학술대회논문집 Vol.2010 No.06
우리나라의 신재생에너지 기술개발은 2008년 '저탄소 녹색성장' 국가 비전 선포 이후 국가 에너지 R&D 전략의 중심에 자리 잡고 있다. 이미 우리의 경쟁 대상인 선진국들은 신재생에너지 기술을 중심축으로 녹색산업을 신성장 동력으로 활용하고자 국력을 집중하고 있다. 우리나라는 선진국과 비교할 때 상대적으로 신재생에너지 기술개발 후발자이다. 기술적 핸디캡을 극복하고 대등한 경쟁에 뛰어들기 위해서는 신재생에너지 기술보유 선진국과의 국제협력을 통한 시너지효과 창출이 필요하다. 이는 최고수준의 국가 및 기관들과 협력을 도모함으로써 기술개발 기간 단축은 물론 조기 기술격차 해소가 가능하기 때문이다. 이러한 국가간 상호협력을 위해서는 무엇보다 기술 분야별 선진국 수준과 우리의 수준에 대한 객관적인 분석이 필요하다. 이를 위해 주요 신재생에너지 기술들을 대상으로 심층적인 전문가 조사를 통해 전세계 주요 국가 및 관련 업체들의 기술수준 및 협력 선호 유형을 분석하였다. 이에 더해 관련 기술 시장 상황을 고려하여 기술별 국제 협력 추진 전략을 시장주도형 모델과 공동연구형 모델로 나누어 수립하였다. 수립된 전략을 바탕으로 신재생에너지 기술 국제협력 활성화를 위한 정책 추진 방향을 제시하였다.
최봉하(Choi, Bong-Ha),박수억(Park, Soo-Uk),이덕기(Lee, Deok-Ki),김석기(Kim, Seok-Ki),송진수(Song, Jin-Soo) 한국신재생에너지학회 2006 신재생에너지 Vol.2 No.4
This paper analyses the economics of 50kW PV system installed in Tibet and using domestic technology. We show that this system can be expanded to very large-scale photovoltaic power generation [VLS-PV] system successfully. Based on this result, we conduct the economic analysis of 100MW VLS-PV system designed assuming that it will be installed from 2008 to 2017 in Tibet. In this analysis, future price of PV module and system are estimated based on the methodology of experience curve. In 50kW PV system, the generation cost is calculated at 567.2 won/kWh and this is lower than the one of domestic PV system. In future 100MW VLS-PV system. the generation cost is calculated at 305.4 won/kWh by declining system price. If the lifetime and efficiency of the system goes up, due to future technological improvements, the generation cost can be lowered. Moreover, under the environmental and political effect, VLS-PV system can be as competitive as the conventional energy within 20 years.
최봉하(Choi, Bong-Ha),박수억(Park, Soo-Uk),이덕기(Lee, Deok-Ki) 한국신재생에너지학회 2007 신재생에너지 Vol.3 No.2
This paper analyses the environmental effect of 100kw PV system installed in Tibet using Life Cycle Assessment(LCA). Then, energy payback time(EPT) and life-cycle co₂ emission rate are estimated based on life-cycle of the PV system. As a result of the estimation, 6 year of EPT and 20 g-C/kWh of co₂ emission rate are obtained. In China, average co₂ emission rate of fossil fuel power generation plant is 260 g-C/kWh. This shows that PV system would be very promising for global environmental issues. For advanced LCA, we need to collect detailed and various data about raw material of PV system.
최봉하(Choi, Bong-Ha),박수억(Park, Soo-Uk),이덕기(Lee, Deok-Ki) 한국신재생에너지학회 2006 한국신재생에너지학회 학술대회논문집 Vol.2006 No.11
본 논문에서는 국내 기술을 활용하여 Sunbelt 지역에 설치된 50kW급 PV 실증 단지에서의 태양광발전을 대상으로 경제성을 분석하였으며, VLS-PV로의 성공적인 확장 가능성을 발견하였다. 이를 바탕으로 2008년부터 2017년까지의 10년 동안 연간 10MW급의 단계적 시스템설치를 통한 최종 100MW급의 VLS-PV 개발을 가정하여 경제성 분석을 수행하였다. 이 과정에서 과거 누적 PV 설비용량과 PV 시스템 가격사이의 관계를 경험곡선을 활용하여 분석하였으며, 이에 기초하여 2017년까지의 PV 모듈 및 PV시스템의 가격을 예상하였다. 현재 실증 단계에서의 발전단가는 567.2원/kWh으로 나타나 국내 태양광발전보다 낮은 발전단가를 보였으며, 가격 하락 효과를 적용한 100MW급의 VLS-PV 시스템 개발시에는 최종 305.4원/kWh이 될 것으로 전망되었다. 향후 기술혁신에 따른 모듈의 효율향상과 시스템 수명의 증가는 경제성을 더욱 향상시킬 것이며, 환경적인 이점 및 정책적인 효과까지 고려할 경우 향후 20년 이내에 기존의 발전원과 비교하여 충분한 경쟁력을 확보할 수 있을 것으로 예상된다.
DEA 모형을 이용한 천연가스 미공급지역의 공급타당성 분석
홍성준,최봉하,이덕기,이정태,박수억,구기관 대한산업공학회 2009 대한산업공학회 춘계학술대회논문집 Vol.2009 No.5
천연가스는 지속적인 유가상승에 따른 석유류 에너지와의 가격차이 확대로 에너지원간 비용차이가 점차 증가하는 추세이며, 안전하고 청정한 천연가스 보급 및 확대 요구는 전국에 서 지역별로 지속적으로 이루어지고 있다. 본 연구에서는 DEA 모형을 적용하여 천연가스 미공급지역에 도시가스를 공급하기 위한 공급대안들을 평가하였다. 본 연구결과를 활용하여 제9차 장기 천연가스 수급계획을 수립하는데 반영하였으며, 향후 추가적인 천연가스 미공급지역의 공급타당성을 분석하는데 기초자료로서 활용될 수 있을 것이다.