http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Study on low pressure evaporation of fresh water generation system model
정한식,Supriyanto Wibowo,Berkah Fajar,Yonghan Shin,정효민 대한기계학회 2012 JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY Vol.26 No.2
A low pressure evaporation fresh water generation system is designed for converting brackish water or seawater into fresh water by distillation in low pressure and temperature. Distillation through evaporation of feed water and subsequent vapor condensation as evaporation produced fresh water were studied; tap water was employed as feed water. The system uses the ejector as a vacuum creator of the evaporator, which is one of the most important parts in the distillation process. Hence liquid can be evaporated at a lower temperature than at normal or atmospheric conditions. Various operating conditions, i.e. temperature of feed water and different orifice diameters,were applied in the experiment to investigate the characteristics of the system. It was found that these parameters have a significant effect on the performance of fresh water generation systems with low pressure evaporation.
터널층류방식 청정실에서의 난류운동과 열전달에 관한 수치해석(1)
정한식,정효민 한국마린엔지니어링학회 1995 한국마린엔지니어링학회지 Vol.19 No.4
The turbulent flow and heat transfer in the tunnel laminar flow type clean room is investigated by a numerical simulation. The model clean room is assumed to be a rectngular $5m\times3m$, in which a worktable of 0.75m hight, and 1.5m or 3m long at the floor. Major parameters are the inlet flow velocity, inlet hole size and worktable surface distance. The mean Nusselt number is increased by increasing Reynolds number and can be expressed by the correlation equation.
UML 모델링과 COM을 기반으로 한 컴포넌트의 런타임 갱신
정한식,김일곤,김황수,Jung, Han-Shik,Kim, Il-Kon,Kim, Hwang-Soo 한국정보과학회 2000 정보과학회 컴퓨팅의 실제 논문지 Vol.15 No.11
컴포넌트의 런타임 갱신은 컴포넌트를 사용하는 프로그램을 종료하지 않고, 기존에 사용하는 컴포넌트를 그 내부가 새로 변경된 컴포넌트로 교환하는 기술이다. 최근 소프트웨어 개발에서는 기존 컴포넌트를 재활용하여 새로운 소프트웨어를 개발하는 추세이다. 그러나 컴포넌트가 시간 측면에서 연속적인 서비스를 제공해야하는 소프트웨어에 사용될 때 컴포넌트를 새롭게 기능이 바뀐 것으로 변경하려면 기존 소프트웨어를 종료해야한다. 이 경우 기존 소프트웨어의 서비스를 제공받는 사용자는 서비스를 다시 요구해야 되며 때로는 자신이 사용하는 정보를 손실하는 경우도 발생한다. 따라서, 본 논문에서는 기존 컴포넌트 갱신 방법의 문제점을 해결하기 위하여 소프트웨어를 종료하지 않고 그 소프트웨어를 구성하는 컴포넌트를 새로운 컴포넌트로 갱신하기 위한 방법을 제시한다. Runtime updating of component is a technology which is replacing component used in program with newly implemented component without terminating running program using old one. Recently, it is trend that softwares are developed by reusing the existing component. When we use these components to softwares which have to offer consecutive services, they must be terminated or shutdown to update component with newly implemented one. In this case, users who are offered services of software have to request them one more time and sometimes lose informations which they use. Therefore, this paper suggests how to update components with newly implemented one without terminating tbe running software wbicb is cmnposed witb tbe component for tbe purpose of solving problems which are occurred wben existing components are being ubdated.
브라인 재가열을 이용한 증발식 해수담수화설비의 성능개선
정한식,이영호,박용호,김정태,최순호,정광운 한국마린엔지니어링학회 2019 한국마린엔지니어링학회지 Vol.43 No.6
As thermal seawater desalination requires a fairly large amount of energy to produce freshwater compared with other processes, it is very important to reduce energy consumption through the improvement of a process. This paper proposes a method to reduce energy consumption for multistage flashing desalination (MSF) plants, which currently operate mainly in the Middle East region. In the MSF process, the brine that has not been evaporated in the preceding stage is supplied to the next stage; this supplied brine is evaporated in the next stage at lower pressure and temperature conditions. This process is continued from the first stage to the last stage. In this study, the energy consumption could be reduced by reheating the brine to the top brine temperature (TBT) and by transferring a part of brine to the stage following the next stage, or by reheating the brine supplied to the next stage up to the TBT. According to the calculation results, the specific energy required to produce 1 kg of freshwater can be reduced by up to approximately 5 % if the proposed brine reheating method is applied to MSF plants that are currently in operation. 증발식 해수담수화설비는 타방식에 비해 담수생산을 위한 에너지소비가 매우 크기 때문에 공정개선을 통해 에너지를 절감하는 것은 매우 중요하다. 본 연구에서는 중동지역에 이미 설치되어 운전 중인 대용량의 다단플래싱방식의 증발식 해수담수화공정을 대상으로 에너지절감방안을 제안하고 있다. 다단플래싱방식에서는 전단에서 증발하고 남은 브라인이 전단보다 낮은 온도와 압력으로 운전되는 후단으로 이송되어 단계적으로 증발하는 방식을 취하는데, 본 연구에서는 전단에서 후단으로 넘어가는 브라인의 일부를 최전단의 증발기로 공급되는 브라인 온도까지 재가열 후에 후단 혹은차후단으로 공급하는 공정개선을 통해 에너지절감을 달성하였다. 본 연구의 계산결과에 따르면 현재 운전 중인 다단플래싱방식의 해수담수화플랜트에 브라인 재가열방식을 적용하는 경우 담수 1 kg을 생산하는데 필요한 비에너지를 최대약 5 %까지 절감할 수 있음을 확인하였다.