http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
고유 및 공통부품으로 구성되는 제품의 생산을 위한 단일기계 일정계획
윤상흠,고재상 한국경영과학회 1998 한국경영과학회 학술대회논문집 Vol.- No.1
This study considers a single facility scheduling problem concerned with the manufacture of components for subsequent assembly into end-products. Each end-product is composed of common and unique components, and a setup is required for a batch of common components. Under the so-called "batch availability" environment, we propose an efficient dynamic programming(DP) procedure for the optimal sequencing and batching schedule with minimum total completion times of end-products in the situation that a product is said to be complete if both common and unique components of the end-product are finished. Computational results show that the proposed DP procedure is more efficient than that of Liao[4].
윤상흠,하귀용,최석봉 한국경영교육학회 2011 경영교육연구 Vol.26 No.6
그린 에너지 산업은 향후 국내 기업에게 새로운 수익원으로 부상할 가능성이 높으며 차기 성장 동력으로 가능성을 인식하고 끊임없이 투자한 기업들이 현재 시장을 석권하고 있다. 그린 에너지 시장은 아직 도입 초기 단계로 향후 성장 가능성이 매우 크다. 이에 본 연구에서는 국내 그린에너지 산업에 종사하는 기업들의 경영 효율성 분석을 실시하고자 한다. 이를 통해 선도 기업들을 파악하고 다양한 기업의 투입 및 산출지표의 관점에서 각 기업들이 개선해야 할 방향을 제시하고자 한다. 이를 위해 본 연구에서는 효율성 분석에서 많이 이용되는 자료포락분석(Data Envelopment Analysis)을 활용하여, 국내 53개의 그린 에너지 기업을 실증 분석하였다. 선택된 투입요소는 총자산, 제조원가, 종업원 수이며, 산출요소는 매출액, 당기순이익이다. DEA 분석을 통해 국내 그린 에너지 산업의 효율성이 어느 정도 되는지 파악하고 효율성 측면에서 가장 선도영역(frontier)에 속한 기업을 조사하였다. 이러한 효율성 평가를 바탕으로 향후 개별 기업의 효율성 향상을 위한 벤치마킹의 기초자료를 제공하고자 한다. 또한 매출액에 따른 규모별, 산업 내 업종별 추가분석을 실시함으로써 각 기업이 속한 동질성을 가지는 경쟁업체와 상대적으로 비교된 효율성 분석을 통해 현실적인 벤치마킹의 자료를 제공하고자 한다. 분석결과, 전체 연구대상 기업들의 CCR 모형에 의한 평균 효율성은 0.748, BCC 모형에 의한 효율성은 0.787이며, 규모효율성은 0.954로 측정되었다. 매출액 1,000억 이상인 그룹과 1조 이상인 그룹의 경우 효율성 값들이 0.9 이상으로 매우 높게 나타났으며, 1,000억 미만의 그룹의 경우에는 CCR 모형에 의한 평균 효율성이 0.794로 다른 매출액 그룹들에 비해 낮게 나타났다. 이는 매출 규모가 작은 기업들이 비교적 비효율적으로 운영되고 있음을 알 수 있다. 업종별 효율성 평가 결과, 시공 업종이 타 업종에 비해 효율성 값이 높게 나타났으며, 잉크/웨이퍼 업종의 효율성 값이 전반적으로 낮게 나타났다. This study investigates the management efficiency of firms in green energy industry based on a data envelopment analysis(DEA) approach. We applied gross asset, manufacturing cost and number of employee as input factors while the total sales and net profit as output measures. In particular, we examined the management efficiency across green industry firms according to their sales scale and types of production process. This paper contributes to the understanding of firm level dynamics of management efficiency in Korean green energy industry. By considering industry specific feature of green energy firms, we have assessed relative technical and scale efficiencies of management across ICT SMEs. The findings of the paper have significant practical implications to management strategy for green energy firms and other technology-intensive industry that requires continuous improvement in management efficiency for their competitive advantage.
생산 및 배송을 위한 공급사슬망에서의 일정계획에 관한 연구
윤상흠,이익선 한국경영과학회 2006 韓國經營科學會誌 Vol.31 No.4
This paper considers an integrated scheduling problem for consecutive production and delivery stages in a two-stage supply chain. The production is performed on a single facility and then the finished products are delivered to the customer by capacitated multiple vehicles. The objective of this paper is to obtain job sequencing and delivery batching minimizing the total cost of the associated WIP inventory, finished product inventory and delivery. The inventory cost is characterized by the sum of weighted flowtime. The delivery cost is proportional to the required number of delivery batches. Some polynomial-solvable cases are derived. For the general case, two efficient heuristic algorithms are suggested, and then the heuristics are tested through some numerical experiments.
A Note on the Reversibility of the Two Stage Assembly Scheduling Problem
윤상흠,이익선,성창섭 한국경영과학회 2007 Management Science and Financial Engineering Vol.13 No.1
This paper is concerned with proving a conjecture that the two stage assembly system is reversible in deterministic makespan scheduling context. The reversibility means that a job sequence in the as-sembly system has the same makespan as that of its reverse sequence in the disassembly system which is the reversal of the assembly system. The proposed conjecture shows that the reversibility of serial flowshops can be extended to non-serial and synchronized shops.