http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
강창원,최길수,한성배,김범수,정연해,이기철,Kang, Chang-Won,Choi, Gil-Soo,Han, Sung-Bae,Kim, Bum-Soo,Chung, Yeon-Hae,Lee, Ki-Cheol 한국전기기술인협회 2001 電力技術人 Vol.228 No.8
우리나라에서는 3 Θ 4w 배전방식을 채택하고 있는데 최근에는 컴퓨터 등 OA 기기 사용증가로 이때 발생하는 영상분 고조파에 의하여 중성선에 상전류 보다 큰 전류가 흐르게 된다. 고조파에 의한 중전선 과전류는 케이블, 변압기, 과열소손, 변압기, 발전기 출력저하, 역률저하, 전력손실 증가, ELB, MCCB 오동작, 유도장해, 중성선 대지전위 상승 등 심각한 장애를 일으키고 있다. Wide use of non-linear loads such as personal computers, monitors, laser printers, variable speed drives, UPS systems and other electronic equipment have led to harmonics becoming #1 issue in the electrical industry today. Commercial and Industrial building power distribution systems, designed for the old, linear-style loads especially when found in high densities. Some common power system problems include overloaded neutral conductors, overheated distribution transfOlmers, high neutral-to-ground voltage, poor power factor and distortion of the voltage waveform supplying these loads. The power quality problems, particularly high voltage distortion, have been known to cause equipment downtime due to malfunctions and component failure.
유연생산라인의 부하평준화를 위한 작업흐름선택 전문가시스템
함호상,한성배 한국지능정보시스템학회 1996 지능정보연구 Vol.2 No.1
A flexible flow line(FFL) consists of several groups of identical machines. All work-orders flow along the same path through successive machine groups. Thus, we emphasized the balancing of workloads between machine groups in order to maximize total productivity. On the other hand, many different types of work-orders, in varying batch or lot sizes, are produced simultaneously. The mix of work-orders, their lot sizes, and the sequence in which they are produced affect the amount of workload. However, the work-orders and their lot sizes are prefixed and cannot be changed. Because of these reasons, we have developed an optimal route selection model using heuristic search and Min-Max algorithm for balancing the workload between machine groups in the FFL.