SCP-Matrix based shipyard APS design: Application to long-term production plan
SeungHoon Nam,HuiQiang Shen,Cheolho Ryu,Jong Gye Shin 대한조선학회 2018 International Journal of Naval Architecture and Oc Vol.10 No.6
A shipyard is an Engineer To Order (ETO) company that designs and manufactures new products when orders are placed. Various tasks are concurrently performed, thereby making process management considerably important. It is particularly important to plan and control production activities because production constitutes the largest part of the overall process. Therefore, this study focuses on the development of a production planning system based on an Advanced Planning System (APS). An APS is an integrated planning system that targets supply chain processes in accordance with the principles of hierarchical planning. In this study, a Supply Chain Planning Matrix (SCP-Matrix), which is used as a guideline for APS development, is designed through analysis of shipyard cases. Then, we define the process in detail, starting from long-term production plan as the initial application, and design and implement a long-term production planning system using a component-based development.
SCP-Matrix based shipyard APS design: Application to long-term production plan
Nam, SeungHoon,Shen, HuiQiang,Ryu, Cheolho,Shin, Jong Gye The Society of Naval Architects of Korea 2018 International Journal of Naval Architecture and Oc Vol.10 No.6
A shipyard is an Engineer To Order (ETO) company that designs and manufactures new products when orders are placed. Various tasks are concurrently performed, thereby making process management considerably important. It is particularly important to plan and control production activities because production constitutes the largest part of the overall process. Therefore, this study focuses on the development of a production planning system based on an Advanced Planning System (APS). An APS is an integrated planning system that targets supply chain processes in accordance with the principles of hierarchical planning. In this study, a Supply Chain Planning Matrix (SCP-Matrix), which is used as a guideline for APS development, is designed through analysis of shipyard cases. Then, we define the process in detail, starting from long-term production plan as the initial application, and design and implement a long-term production planning system using a component-based development.
Ju, Suheon,Sung, Saenal,Shen, Huiqiang,Jeong, Yong-Kuk,Shin, Jong Gye The Society of Naval Architects of Korea 2020 International Journal of Naval Architecture and Oc Vol.12 No.-
In this paper, we propose a simulation method based on backward simulation and process-oriented simulation to take into account the characteristics of shipbuilding production, which is an order-based industry with a job shop production environment. The shipyard production planning process was investigated to analyze the detailed process, variables and constraints of mid-term production planning. Backward and process-centric simulation methods were applied to the mid-term production planning process and an improved planning process, which considers the shipbuilding characteristics, was proposed. Based on the problem defined by applying backward process-centric simulation, a system which can conduct Discrete Event Simulation (DES) was developed. The developed mid-term planning system can be linked with the existing shipyard Advanced Planning System (APS). Verification of the system was performed with the actual shipyard mid-term production data for the four ships corresponding to a one-year period.
Ju, Suheon,Sung, Saenal,Shen, Huiqiang,Jeong, Yong-Kuk,Shin, Jong Gye The Society of Naval Architects of Korea 2020 International Journal of Naval Architecture and Oc Vol.12 No.1
In this paper, we propose a simulation method based on backward simulation and process-oriented simulation to take into account the characteristics of shipbuilding production, which is an order-based industry with a job shop production environment. The shipyard production planning process was investigated to analyze the detailed process, variables and constraints of mid-term production planning. Backward and process-centric simulation methods were applied to the mid-term production planning process and an improved planning process, which considers the shipbuilding characteristics, was proposed. Based on the problem defined by applying backward process-centric simulation, a system which can conduct Discrete Event Simulation (DES) was developed. The developed mid-term planning system can be linked with the existing shipyard Advanced Planning System (APS). Verification of the system was performed with the actual shipyard mid-term production data for the four ships corresponding to a one-year period.