http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
불규칙한 노면(路面)을 주행하는 이동하중에 의한 연속교의 동적거동에 관한 이론 및 실험적 연구
장승필,임성순,조서경,Chang, Sung Pil,Yhim, Sung Soon,Jo, Sir Kyung 대한토목학회 1989 대한토목학회논문집 Vol.9 No.3
In this study, the dynamic behavior of a continuous bridge under moving load is studied considering roughness of the road surface. Vehicle model includes the spring effects of axes, and due to these effects, equations of motions for the vehicle and bridge are derived in coupled form. And then iteration method is used to solve the equations. In experimental study a bridge model is constructed considering the similarity rule in order that the model exhibits dynamic behavior similar to that of prototype. Three types of roughness such as uneven random roughness, uplift on the approach and piece-wise constant roughness are used to describe road roughness. Through the numerical analysis and experiments, the effects of surface roughness, sprung mass, and velocity on the dynamic behavior of the bridge are examined. 본 연구에서는 유한요소법과 실험적인 방법으로 이동하중용 받는 불규칙한 노면을 갖는 연속교의 동적거동을 연구하였다. 차량하중은 차축의 스프링효과를 포함하였으며 이로 인해 교량과 차량의 운동방정식은 결합된 미분방정식으로 표현되었고 이를 반복시산법으로 해결하였다. 실험적인 방법에서는 상사율을 고려하여 원형과 모형에서 동일한 동적거동이 나타나도록 모델을 제작하였고 이러한 교량 불규칙조도면, 진입부 단차면, 연속 단차면을 주어 실험하였다. 속도의 분포와 조도면의 양상 및 차량의 진동에 따른 교량의 동적거동을 이론 및 실험적인 방법으로 비교, 분석하였다.
선형퍼지회귀분석기법을 이용한 합성형 사장교 케이블의 장력보정
권장섭,장승필,조서경,Kwon, Jang Sub,Chang, Seung Pil,Cho, Suh Kyoung 한국강구조학회 1997 韓國鋼構造學會 論文集 Vol.9 No.4
사장교의 시공 특성상 여러 가지 원인에 의하여 오차가 발생하고, 복잡한 시공 과정을 거치는 동안 오차가 누적되어 점점 확대된다. 따라서, 설계와는 상당히 달리 부재에 불리한 응력분포와 교량의 과도한 처짐 등이 발생할 수 있다. 부재의 응력분포와 교량의 기하형상을 바람직한 방향으로 수정하기 위해 사장교의 시공 중에 케이블의 장력보정이 불가피하다. 기존의 장력보정 방법은 오차 단위의 차이를(케이블 장력과 주형의 처짐 등) 고려하기 위하여 최적화 과정 중에 가중치 계수를 사용하여야 한다. 하지만 이 가중치 계수를 결정하는 것이 쉽지 않고, 한 차례의 보정을 실시한 후에도 오차가 설계허용범위를 벗어날 때는 새로운 가중치 계수를 도입하여 여러 번 반복 수행해야하므로 상당한 시간이 요구된다. 본 연구에서는 이와 같은 점을 고려하여 선형퍼지회귀분석기법을 케이블 장력보정에 적용하였다. 이 방법은 설계자의 의도와 시방 규정을 선형최적화 문제의 구속 조건의 형태로 정식화 과정에 포함시킬 수 있고, 기존의 방법보다 빠르게 현장에서의 장력보정을 수행할 수 있다. During the construction of cable stayed bridge, errors are always caused by various reasons, accumulated and amplified through the complex construction steps. It is likely that the undesirable stress distribution of members and the large deflection of the bridge different from design values come out The adjustment of cables during construction is absolutely indispensable to correct the stress distribution of the members and the geometrical configuration of the bridge. In the conventional method, weight coefficients are used to consider the difference of units between cable forces and girder deflections during the optimization process of cable adjustment. However, it is not easy to determine weight coefficients and the adjustment must be repeated several times with the time consuming process of the determination of new weight coefficients in case that errors are out of design allowable limits. In this paper, fuzzy linear regression analysis is applied to the cable adjustment to overcome those problems. In the application of fuzzy linear regression analysis method the designer's intention and the design allowable limits can be formulated in the form of the constraints of the linear optimization problem. Therefore, the cable adjustment in construction site can be carried out with the fuzzy linear regression analysis more rapidly than with the convetional method.
양인환,김학수,조서경 호남대학교 2002 호남대학교 학술논문집 Vol.23 No.2
In recent years. the construction methods of precast prestressed concrete beam bridges by using tendon have been increasingly proposed. The properties of flexural tensile strength between precast prestressed concrete beam and cast in-place concrete is an important factor that affects the structural performance. This paper aims at evaluating age after placing new concrete was evaluated. Test results show that the tensile strength between old and new concrete is much smaller than that of monolithic concrete. Also, it is shown that the curing condition of concrete has the tremendous effect on tensile strength.