http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Dou Zhifeng,Wang Nan,Chen Zhinan,Zheng Anping,Lu Falong,Lv Zhongbin 대한전기학회 2023 Journal of Electrical Engineering & Technology Vol.18 No.2
Conventional Finite Control Set Model Predictive Control (FCS-MPC) suffers from large neutral point voltage fluctuation, cumbersome calculation process, as well as high current Total Harmonic Distortions for 3-level T-type grid-tied inverter. An improved FCS-MPC method is proposed in this paper by directly calculating the switch state’s cost function. This method uses the 3-phase switching state Sx to represent the load current i, the DC side neutral point voltage offset ΔUc, the load current prediction value i(k + 1), and establishes a real-time cost function g through 27 switching vectors. In the loop calculation, the switching vector is selected by minimizing the absolute value of the cost function g, and the output switching state is represented by the switching vector. Thus, the inverter can be switched ON or OFF depending on the stat of the next moment. The FCS-MPC of a 3-level T-type grid-tied inverter is also established by simulation, and the effectiveness of the proposed method is verified by experimental results.