http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
블록 단위 모션정보를 이용한 감시시스템의 움직임 객체추적
신헌수(Heon Soo Shin),현교환(Kyo Hwan Hyun),김성민(Sung Min Kim),최원갑(Weon Gab Choi),원치선(Chee Sun Won),엄기환(Ki Hwan Eam) 대한전자공학회 2007 대한전자공학회 학술대회 Vol.2007 No.7
Object tracking is one of the attractive issues in many applications such as security and surveillance. Although many algorithms have been studies for improving the object tracking technique. We proposed method that the image is divided into several sub-blocks. And the motion information of current image is calculated by block-based motion estimation.
서영주(Young Joo Suh),신헌수(Heon Soo Shin),함효준(Hyo Joon Hahm) 대한설비관리학회 2000 대한설비관리학회지 Vol.5 No.4
N/A Providing quality products and services is at the heart of customer satisfaction. Six sigma provides an effective mechanism to focus on customer requirements, through the improvement of process quality. This paper describes the application of the six sigma on business management and proposed a method of six sigma level calculation accurately, This article gives an overview of the basics of the Six Sigma methodology and its implementation approach.
TPM의 성공적 추진을 위한 국가직무 능력표준 적용에 관한 연구
함효준 ( Hyo Joon Hahm ),김정식 ( Jung Sik Kim ),이영상 ( Young Sang Lee ),신헌수 ( Heon Soo Shin ),강영식 ( Young Sig Kang ) 대한설비관리학회 2016 대한설비관리학회지 Vol.21 No.1
This paper is trying to apply TPM (total productive maintenance) to national competency standards for its useful implementation for the plants and manufacturing sector in Korea. TPM has been widely and effectively being utilized by various sectors such as electrical and electronic industries, car industry, machine and chemical industry, etc. as well. At the same time, some of case studies show that this was refused by machine shops, or by top managers. It has been known that top manager sometimes confuses the definition and framework of TPM and technical personnels of the middle management group lack the maintenance technology required as well as the vision of their future job. As such, this paper proposes NCS of TPM. It usually includes from 6 to 10 pillars among which 9 pillars are selected as competency units in this paper. Each competency unit has its job description and several elements. This paper also suggests that more developed and advanced job description including competency unit, its elements, performance criteria and ranges of variables will be required. Future researches also should provide knowledge, skills and attitude for more efficient practice of TPM.
신헌수,갈원모,함효준 설비관리학회 2001 설비관리학회 학술논문집 Vol.7 No.-
Most studies are focused on the single component or a equipment itself consisting of multiple components. But these policies are not applicable to multi component. If some components are economically independent of all other components of the equipment, replacements policies which assume a single component can be used for those components. However, if the cost of replacement of several parts simultaneous is less than the sum of the costs of separate replacements. the optimal replacement policy can not be applied by the use of a single component model. In this study, therefore, a mode! for determining economical replacement policies for multicomponent equipment is developed.