http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
임종권(Lim Jong-Kwon),박미연(Park Mi-Yun),박흥민(Park Heung-Min),김성훈(Kim Sung-Hun),이광균(Lee Kwang-Kyun) 한국철도학회 2008 한국철도학회 학술발표대회논문집 Vol.- No.-
A severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient VE job plan for especially large scale railroad construction project is proposed in this study. This study developed a more objective performance evaluation system for value engineering study of mega projects and suggested a systematic process of performance quantitative analysis for value improvement. The proposed performance measurement method would be very useful for better communication and consensus between decision makers and VE team.