http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
허석재 ( Heo Seok Jae ),유한국 ( Ryu Han Gook ),최경규 ( Choi Kyoung Kyu ),조승호 ( Cho Seung Ho ),정란 ( Chung Lan ) 한국구조물진단유지관리공학회 2008 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.12 No.2
Economical efficiency of precast concrete WAffle shape slab and conventional RC floor systems investigated in terms of direct construction cost when used as a underground parking structures. The comparison showed that WAS systems require cost 2.7% more than conventional RC floor system. However, the short construction period when using WAS system reduces the indirect construction cost including the Safety management cost and maintenance cost. Consequently, total construction cost considely both direct and indirect construction cost, the WAS system is expected to be economicaly efficient.
드론 스캐닝과 오픈소스 프로그램을 통한 효율적인 BIM 생성
허석재 ( Heo Seok Jae ),최원준 ( Choi Won Jun ),나승욱 ( Na Seoung Uk ),김치경 ( Kim Chee Kyung ) 한국구조물진단유지관리공학회 2023 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.27 No.1
구조물을 스캔하여 BIM(BuiMing Information Model)을 만들어내는 방식은 LiDAR(Light Detection And Ranging Sensor) 라는 센서를 사용하여 구조물의 거리와 모양, 크기를 인식하고 PCM(Point Cloud Mapping)기술로 3차원의 공간을 디지털화 하는 방식이 일반적이다. 여기서 문제는 LiDAR 센서가 고가이며, 인식거리가 짧고 해상도가 낮다는 것이다. 매일 상황이 변화하는 건설현장에서 LiDAR 센서만으로는 BIM화하기에는 많은 비용과 인력, 장비가 필요할 것이며, 앞으로 디지털 현장관리를 위해서 꼭 필요한 현장 BIM화를 위해 드론을 활용하는 방안에 대해 연구하였다.