http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
전시디자인기업 구성원의 마음챙김이 자기효능감 직무만족을 통해 직무성과에 미치는 영향
정수형,황찬규,Jung, Soohyung,Hwang, Changyu 디지털산업정보학회 2018 디지털산업정보학회논문지 Vol.14 No.1
The growth of the Exhibition Design Industry has been exponential both internationally and domestically since the composition and fusion of Artistic Culture and information. Since the introduction of various Display Techniques, such as, augmented reality, Virtual Reality, and 3D interactive applications, the Exhibition Display Industry has seen innovative development. Furthermore, this has transpired a new wave of change and globalization in social network and thru creative Exhibition Design this has become a turning point in the Exhibition Design Industry. The aim of this research is to find Influencing factors of domestic Exhibition Design Industry members. These factors thru self-efficacy and job satisfaction will study objectively to find what influences duty result and help members of Exhibition Design Industries to work comfortably and to increase productivity we are proposing effective and efficient development methods. To do this, we are suggesting a research model applied on variables of the mindfulness theory which is based on the emphasized unconsciousness which represents the existence of the mind. To objectively verify this research model, we have conducted surveys on Exhibition Design Industry workers and a Material Designer in Seoul.
함정은 ( Ham Jung-eun ),황은정 ( Hwang Eun-jung ),정수형 ( Jung Soo-hyung ) 한국구조물진단유지관리공학회 2010 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.14 No.1
This paper is a case study about reinforcement of rock slope which is made because industry has made great rapid progress recently. This slope is consisted of moderate weathering gneiss and it is supposed to take place different type slope failure due to combine irregular direction joint set so we conducted that analysis of slope stability using the program such as S-wedge, Roc-plane. The result of analysis of slope stability using that program, at dry condition safety factor of slope is enough to maintain but that factor decrease at rainy condition and not enough to standard value. So it is expected to happen slope failure. Therefore we need to determine the proper method each case. Stability of slope is maintained by constructing rock bolt in area of the wedge and planner failure. Regarding rock-fall, constructing rock-fall protection fence will have the disaster decreased.