http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
황금숙(Keum-Sook Hwang),장원복(Won-Bok Chang),이태석(Tae-Seok Lee) 대한설비공학회 2016 대한설비공학회 학술발표대회논문집 Vol.2016 No.11
This case study is summarized to introduce the mitigation case of fire compartmentation thru PBD performed especially for the purpose of escape safety enhancement as the one of different schemes that is created to ensure the life safety in the underground space during the period of performing COEX mall renovation project to the grand opening in November of 2014 from the commence in March of 2013.
황금숙(Keum Sook Hwang),장원복(Won Bok Chang) 대한설비공학회 2018 대한설비공학회 학술발표대회논문집 Vol.2018 No.11
The contents of this article contain the items to be considered for fire protection and life safety systems design of high rack warehouse and sales area. Maximum height of goods and ceiling height of actual case study area are 9.5m and 12m respectively. In particular, the ESFR(Early Suppression Fast Response) sprinkler systems were compared between Korean and International standards of installaion.
황금숙(Keum-Sook, Hwang),Mats, Nilsson,곽용상(Michael, Kwak),장원복(Won-Bok, Chang) 대한설비공학회 2015 대한설비공학회 학술발표대회논문집 Vol.2015 No.11
In this study, the commissioning case of IKEA first store in Gwangmyeong city, Korea is focused on the smoke control system thru Performance Based Design and conducting the performance validation during the commissioning process at the construction site. It is practically difficult to verify the performance in the code based smoke control system design by utilizing the HVAC system, and the performance verification is basically required in the performance based smoke control system design. The purpose of this study is to provide the basis of commissioning smoke control system.
황은경(Hwang Eun-Kyoung),김대희(Kim Dae Hee),조정훈(Cho Jeong-Hoon),황금숙(Hwang Keum-Sook) 대한건축학회 2007 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.27 No.1
Recently the consideration for occupants' security has been raised as very important design element from the fire by building's large sized, higher storied, and its compounded. But the domestic Laws regulated the predicative laws according to the technical standard which has no difference from the past domestic evacuation regulations. Therefore when big fire occurs, it is not enough to guarantee for occupants to escape safely. Specially since domestic escape relevant laws are divided into Architect relevant law and fire fighting relevant law, it has caused to bring various problems. So This study will show the problems of the evacuation regulation which is registrated in the Architect relevant law and fire fighting relevant law. And also later, when Architect escape relevant laws re-registrate, this study will be used as foundational materials.
부산타워<TEX>${\bigcirc}{\bigcirc}$</TEX>소방시설등의 성능위주설계 사례
장원복(Jang, Won-Bok),황금숙(Hwang, Keum-Sook),신현승(Shin, Hyun-Seung) 한국화재소방학회 2011 한국화재소방학회 학술대회 논문집 Vol.2011 No.추계
소방방재청 고시 제2011-68호에 의한 소방시설등의 성능위주 설계 방법 및 기준에 의한 부산<TEX>${\bigcirc}{\bigcirc}$</TEX>타워의 성능설계심의 절차및 과정 등의 사례 소개를 목적으로 한다.
김대희(Kim Dae-Hee),황은경(Hwang Eun-Kyoung),황금숙(Hwang Keum-Sook) 대한건축학회 2008 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.28 No.1(계획계)
Recently the consideration for occupants' security has been raised as very important design element from the :fire by building's large sized, higher storied, and its compounded. But the domestic Laws regulated the predicative laws according to the technical standard which has no difference from the past domestic evacuation regulations. Therefore when big fire occurs, it is not enough to guarantee for occupants to escape safely. According to this study focuses on fire safety issues and alternate escape methods in architecture experts. Questionnaires were distributed to fire officer, public service personnel and Architecture designer. A total of 92 questionnaires were analyzed using SPSS 15.0