http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
문효수(Moon, Hyosoo),손보식(Son, Bosik),이현수(Lee, Hyun-Soo),박문서(Park, Moonseo),안수호(Ahn, Suho),김남균(Kim, Namkyoun) 대한건축학회 2017 大韓建築學會論文集 : 構造系 Vol.33 No.1
Standard Specifications for Building Works in Korea which convey technical requirements of the owners to the constructors has been improved through lots of amendments since their first enactment in 1967. However, complaints about user inconvenience and low usability have been raised continuously in their structure and contents. It stems from the gap between providers(mostly from academic) and users, and it could be solved based on experts’ opinions both from academic and industrial field. The purpose of this study is to improve Korean Standard Specifications for Building Works in terms of structure, contents and maintenance. To conduct this study, we drive the main direction and the priority for the improvement of the specifications, suggest a improvement proposal in terms of structure, contents and maintenance. Finally, we validate the improvement proposal. The expert’s opinions on each subject are collected and analysed through various methods. Through this study, user convenience and efficiency are expected to be obtained. Also, it is expected to help write the specified and project specifications which are based on standard specifications.
공공건설공사 발주방식에 따른 비용성과 실증비교 - 설계변경에 대한 낙찰률 매개효과를 중심으로 -
문효수,이현수,박문서,이보경,주선우,손보식,Moon, Hyosoo,Lee, Hyun-Soo,Park, Moonseo,Lee, Bogyeong,Joo, Seonu,Son, Bosik 한국건설관리학회 2015 한국건설관리학회 논문집 Vol.16 No.5
기존연구에서 Design-Build(이하 "DB")가 Design-Bid-Build(이하 "DBB")발주방식보다 비용측면에서 우월하다고 하는 이유는 설계변경이 적기 때문이다. 그러나 만약 DBB가 낙찰률이 낮아 이것을 만회하기 위해 설계변경을 발생시켰다면, DB가 설계변경이 적기 때문에 우월하다는 것은 잘못된 판단이다. 따라서 이러한 판단의 오류를 확인하기 위해 발주방식과 설계변경, 혹은 낙찰률과 설계변경의 영향관계만 분석하던 두 종류의 연구들을 종합적으로 분석하는 것을 시도했다. 또한 경로분석기법을 통해 프로젝트 타입 별로 발주방식과 낙찰률이 설계변경에 미치는 효과크기를 동시에 비교함으로써 낙찰률의 매개효과를 검증하였다. 그 결과 특정 프로젝트 타입에서는 발주방식과 설계변경 사이에 낙찰률이 개입하여 매개효과를 발생시키고 있으므로, DB가 DBB보다 설계변경이 적기 때문에 우월하다고 판단할 수 없음을 검증하였다. 이로써 발주방식이 낙찰률을 통해 설계변경에 작용하는 원리를 밝히고, 낙찰률의 정체성을 기존 연구와는 다른 관점에서 규명하였다. 이를 바탕으로 프로젝트 특성에 따른 매개효과를 고려한 발주방식 선정과 성과측정에 도움을 줄 수 있을 것이라고 기대한다. According to previous research, the reason why Design-Build(hereinafter "DB") outperforms Design-Bid-Build(hereinafter "DBB") in terms of cost is due to less change orders(hereinafter "COs"). However, if biddropping was low for DBB resulting into increasing COs, then it would be wrong to conclude that DB is superior due to less COs. Therefore, in order to confirm such misjudgment, the attempt to comprehensively analyze biddropping, COs and delivery method was made as previous methods had analyzed either the relationship between delivery method and COs, or biddropping and COs. This research uses path analysis, which simultaneously compares effect sizes on COs according to delivery method and biddropping based on the project type, and validated the mediator effect. The research proved that DB outperforms DBB due to less COs cannot be validated as biddropping caused a mediator effect by intervening between the delivery method and COs for specific project types. Therefore, the mechanism of delivery method acts on COs through biddropping was established. Also, the identity of biddropping was investigated in a different perspective from previous research. Based on this result, this research is expected to help determine a delivery method by considering the mediator effect of specific projects and evaluate performance.
모듈러 현장시공단계 안전관리를 위한 FMEA 평가방식 제안
이세연 ( Lee Seyeon ),문효수 ( Moon Hyosoo ),안용한 ( Ahn Yonghan ) 한국구조물진단유지관리공학회 2022 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.26 No.1
모듈러 건축시공은 일반 건축시공에 비해 설치 및 양중단계에서 사고 발생 비율이 높아 공법적 차이를 고려한 차별화된 안전관리체계가 필요함에도 불구하고 별도의 체계가 수립되어 있지 않다. 또한, 모듈러 시공현장의 안전관리에 대한 연구가 아직 미비하여 모듈러 현장 안전성에 대한 우려가 있다. 본 연구에서는 모듈러 시공단계의 FMEA Sheet를 제안하여 현장 사고 발생 예방 및 작업자 교육을 위한 자료로 제시하고자 한다.
국내 원전 방사화 콘크리트 구조물 해체공사 리스크 분류체계 구축 : 구조적·인적 리스크를 중심으로
이상렬(Lee, Sang Ryul),문효수(Moon, Hyo Soo),조한광(Cho, Han Kwang),권나현(Kwon, Na Hyun),최중식(Choi, Jung Sik),안용한(Ahn, Yong Han) 한국퍼실리티매니지먼트학회 2021 한국퍼실리티매니지먼트학회지 Vol.16 No.2
Lee, Sang Ryul Moon, Hyo Soo Cho, Han Kwang Kwon, Na Hyun Choi, Jung Sik Ahn, Yong Han Abstract The purpose of this study is to develop a risk breakdown structure by deriving structural and job risks that may occur during the dismantling of radiated concrete structures in nuclear power plants. In order to achieve the purpose, the similarity between nuclear power plant dismantling and construction demolition work was analyzed, and a work breakdown structure was established to derive risk factors for each cutting work type and structural and job risks based on expert interviews. As a result, this study developed a practical risk breakdown structure that can be used when dismantling nuclear power plants.
국내 원전 방사화 콘크리트 해체공사 위험요인 중요도 평가 기초연구
이상렬 ( Lee Sangryul ),문효수 ( Moon Hyosoo ),안용한 ( Ahn Yonghan ) 한국구조물진단유지관리공학회 2022 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.26 No.1
본 연구의 궁극적 목적은 원자력발전소 방사화 콘크리트 구호물의 해체과정에서 발생할 수 있는 구조적 · 인적 리스크를 도출해 리스크 분류체계를 구축하고 각 위험요인의 중요도 평가를 통해 위험순위를 도출하는 것이다. 이를 위해 사전연구로서 건설 철거작업과의 유사성 분석 및 전문가 인터뷰를 통한 작업분류체계 및 리스크 분류체계를 구축하였다. 본 연구는 고도화된 원전 방사화 콘크리트 해체공사 리스크 분류체계 기반 Fuzzy-AHP를 적용해 중요도 평가를 실시하기 위한 기초연구를 수행하였다.
내용연수와 기능성 평가를 활용한 군 시설물 리모델링 대상 선정 프로세스 모델
조종우,이현수,박문서,김재곤,문효수,Cho, Jongwoo,Lee, Hyun-Soo,Park, Moonseo,Kim, Jaegon,Moon, Hyo-Soo 한국건설관리학회 2015 한국건설관리학회 논문집 Vol.16 No.6
군 시설물은 80년대 이후 현대화 계획 및 군 복지의 향상 등으로 인해 그 수가 급격하게 증가하였다. 그러나 이렇게 증가한 시설물에 대해 체계적인 유지관리가 이루어지지 못하여 노후화되면서 이러한 노후시설의 성능향상이 필요하게 되었다. 노후 시설물의 성능향상 방안은 재건축과 리모델링으로 나눌 수 있다.그러나 표준 리모델링 범위 내에서는 리모델링이 더 경제적이라는 연구결과에도 불구하고 군 시설의 리모델링은 성능 향상의 수단으로써 재건축과 동등하게 고려되고 있지 않다. 따라서 본 연구에서는 건축물의 생애주기 동안의 성능 변화와 리모델링 필요 범위의 관계성에 착안하여 재건축보다 리모델링이 경제적인 특정시점(SPT)에 리모델링을 선택하는 방식의 리모델링 프로세스 모델(RPM)을 제안한다. 또한 군 시설물의 자료에 근거하여 이를 위해 필요한 현실성 있는 내용연수와 기능성 평가기준을 함께 제시한다. 이 RPM을 통해 기존프로세스에서 발생하는 안전성에는 문제가 없으나 기능성에 문제가 있는 시설물들이 적절한 리모델링 시기를 놓쳐 어쩔 수 없이 재건축을 하게 되는 사례를 방지할 수 있게 하였다. 또한 준공시기와 유형이 다른 시설물을 관리하는 입장에서의 재건축/리모델링 선택의 의사결정을 보다 간단하게 할 수 있는 가능성을 제시하였다. 이러한 리모델링에 보다 초점을 맞춘 프로세스를 통해 예산절감 효과뿐만 아니라 재건축으로 인한 사회적 낭비를 줄이는데 기여할 수 있을 것이라 판단된다. The number of military facilities has been rapidly increased due to growing requirement of modernization and military welfare. However, adequate maintenance has not implemented to these facilities. As a result, they are deteriorated quickly and require performance enhancement treatments. There are two ways of performance enhancement, reconstruction and remodeling. Despite the research result that remodeling within the standard remodeling range is more economical, remodeling of military facilities is not considered equivalent to reconstruction as an option of performance improvement. Therefore, derived from the relationship between performance change during life cycle of building and range of remodeling needs, this study tries to propose Remodeling Process Model(RPM) which uses a method to choose remodeling in a Specific Point of Time(SPT) when remodeling is considered more economical than reconstruction. In addition, this study suggests practical service life and functionality evaluation standard together which require to realize the RPM. This RPM make it possible to avoid the cases that facilities which do not have any problem on structural reliability but have low level of functionality miss appropriate remodeling timing and inevitably choose reconstruction as a performance improvement option. It also present the possibility of simple reconstruction / remodeling decision-making for facility managers who administrate building having various type, compilation and elapsed time. Consequently, this process model focusing on remodeling more may contribute to reduce resource waste caused by reconstruction.