http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
김영범(Y. B. Kim),권갑주(K. J. Kwon),윤인식(I. S. Yoon),최종귀(J. K. Choi),황지혁(J. H. Hwang),손기철(K. Ch. Son),김성영(S. Y. Kim) 대한기계학회 2009 대한기계학회 춘추학술대회 Vol.2009 No.11
Domestic Enforcement Regulation of the Atomic Energy Act requires the Equipment Qualification (EQ) of safety-related equipment in nuclear power plants to be included at Periodic Safety Review (PSR). The purpose of this study is to verify the integrity of AOV (Air Operated Valve) actuator by equipment qualification, which will be followed by the localization of the AOV and its actuator. The AOV actuator, whose model number is SDD-VA-1, was developed based on the requirements of the relevant ASME and ASNI Codes. The procedure for the equipment qualification was established based on the EQ Rule (10CFR50.49), Reg. Guide 1.89, IEEE 323(1983) and IEEE 382(1972). Detailed test procedure was based on that of Korea Institute of Machinery and Materials (KIMM) and the EQTR of a referenced valve was used.
권병일,김성영 한양대학교 공학기술연구소 1995 공학기술논문집 Vol.4 No.1
The analysis of the thin lamination model of the amorphous transformer by FEM requires menu region division and much calculationg time, and it has difficulty in calculation for modern computer. A new method which is simulated by a solid but anisotropic block with the magnetic permeabilities in the orthogonal dimension selected to account for the presence of the lamination.[3] Based on this equivalent anisotropic block model, we have analyze the ion loss of the amorphous transformer by FEM.