사용자 요구분석을 통한 리모델링방법 선정에 관한 연구-공동주택을 중심으로-
윤여완,박도경,양극영 한국건축시공학회 2004 한국건축시공학회지 Vol.4 No.2
Lately construction industry tends to prefer remodeling of existing buildings rather than new construction or reconstruction of buildings due to strengthening of several restriction related to real estates along with prolonged depression. And also, remodeling of building costs less and creates less wastes compared to reconstruction and so it is more profitable in financial and environmental view. However remodeling is process of creating new environment with existing building. Therefor remodeling must follow the procedure realizing problem and fix the problem based on through investigation on existing building and users requirement must be faithfully reflected. Specially in case of apartment houses, since vagueness on ownership and management authority on common parts exists. Hereupon, in this study we are to present the procedure of analyzing apartment house remodeling method through user requirement by approaching to several considerable factors in user request side.
윤여완,양극영,Yoon, Yer-Wan,Yang, Keek-Young 한국건축시공학회 2002 한국건축시공학회지 Vol.2 No.4
The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.
양극영,문명완,윤여완 圓光大學校 1995 論文集 Vol.29 No.2
For the effective management of complicated and unpredictable situation of construction site, each activities of the whole time-schedule should be understood by means of definite, systematic and diagramed information. The purpose of this study is to find out characteristics of organization and behavior of work team on the basic of Network diagram and to analyze the dangerous factors with respect to each activities, and to make a changed Network diagram using the analyzed factors. As a result, We could prevent the disasters in construction site by applying the changed Network.
고강도 7xxx 알루미늄 합금의 응력부식균열에 미치는 부식환경과 응력속도의 영향
윤여완(Yeo-Wan Yun),김상호(Sang-Ho Kim) 한국표면공학회 2008 한국표면공학회지 Vol.41 No.3
High strength 7xxx aluminum alloys have been applied to automotive bump back beam of the some limited model for light weight vehicle. The aluminum bump back beam is manufactured through extrusion, bending and welding. The residual stress given on these processes combines with the corrosive atmosphere on the road spreaded with corrosive chemicals to melt snow to occur the stress corrosion cracking. The composition of commercial 7xxx aluminum has Zn/Mg ratio about 3 and Cu over 2 wt% for better strength and stress corrosion cracking resistivity. But this composition isn't adequate for appling to the automotive bump back beam with high resistance to extrusion and bad weldability. In this study the composition of 7xxx aluminum alloy was modified to high Zn/Mg ratio and low Cu content for better extrusion and weldability. To estimate the resistivity against stress corrosion cracking of this aluminum alloy by slow strain rate test, the corrosion atmosphere and strain rate separate the stress corrosion cracking from conventional corrosion must be investigated. Using 0.6 Mol NaCl solution on slow strain rate test the stress corrosion cracking induced fracture was not observed. By adding 0.3% H₂O₂ and 0.6M Na₂SO₄ to 1M NaCl solution, the corrosion potential and current density of polarization curve moved to active potential and larger current density, and on the slow strain rate test the fracture energy in solution was lower than that in pre-exposure. These mean the stress corrosion cracking induced fracture can be estimated in this 1M NaCl + 0.3% H₂O₂ + 0 .6M Na₂SO₄ solution. When the strain rate was below 2×10??, the stress corrosion cracking induced fracture start to be observed.
잔골재율 변화에 따른 콘크리트 건조수축 모델링에 관한 연구
박도경,윤여완,김광서 한국건축시공학회 2004 한국건축시공학회지 Vol.4 No.4
Drying Shrinkage has much complexity as it has relations with both internal elements of concrete and external factors. Therefore, experiments on Concrete Drying Shrinkage are carried out in this study under simplified circumstances applying temperature & Humidity test chamber which enables constant temperature and humidity. Comparative analyses have been made respectively according to the consequences aiming at modelling for prediction of Concrete Drying Shrinkage and making out measures to reduce it.Strain Rate of Drying Shrinkage of concrete under the condition of dry air appears to rise by about 20%~30% in proportion as the temperature rises 5℃ when the humidity was held below 10% compared under the condition of dry temperature & Humidity test chamber. Strain Rate of Drying Shrinkage in pit sand concrete increased 20% higher than measured when in river sand under the condition of 90-day material age. A general formula with two variables is derived as follow : . and also graphed in 3 dimensions, enabling to apply to actual design and predict Strain Rate of Drying Shrinkage in concrete. The results of prediction of Rate of Drying Shrinkage by Response Surface Analysis are as follows. The coefficient of correlation of Drying Shrinkage in Concrete was over 90%.
양극영,윤여완,Yang, Keek-Young,Yoon, Yer-Wan 한국건축시공학회 2002 한국건축시공학회지 Vol.2 No.1
In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.