http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Kaihang Wang,Kaili Sun,Zihan Li,Zunhang Lv,Tianpeng Yu,Xin Liu,Guixue Wang,Guangwen Xie,Luhua Jiang 대한금속·재료학회 2020 ELECTRONIC MATERIALS LETTERS Vol.16 No.2
The development of electrocatalysts with high activity and low Tafel slope for overall water splitting has become a crucialchallenge to exploit the sustainable energy. Herein, we construct a Fe–Co–P–Gr catalyst on nickel foam (NF) support throughelectroless composite plating to realize the co-deposition of Fe–Co–P alloys and graphene quantum dots. Interestingly,graphene quantum dots exhibit obvious eff ects on electron mobility and active sites of Fe–Co–P–Gr/NF catalyst. In oxygenevolution reaction, the Fe–Co–P–Gr/NF catalyst exhibits a small overpotential of 230 mV at 10 mA cm −2 and fast kineticswith Tafel slope of 37.8 mV dec −1 . Meanwhile, the Fe–Co–P–Gr/NF also has a superior hydrogen evolution reaction performancein 1.0 M KOH. Compared with the Fe–Co–P alloys, the Fe–Co–P–Gr/NF both as the anode and cathode requireonly 1.58 V to reach a current density of 10 mA cm −2 . The successful preparation of Fe–Co–P–Gr/NF electrode throughelectroless composite deposition provides a new path to manufacture electrocatalysts for overall water splitting.
Key Construction Technology and Monitoring of Long-Span Steel Box Tied Arch Bridge
Jianpeng Sun,Jinbin Li,Yingbiao Jiang,Xiaogang Ma,Zihan Tan,Gaolin Zhufu 한국강구조학회 2023 International Journal of Steel Structures Vol.23 No.1
As a composite system bridge, half-through steel box tied arch bridge combines the arch mainly bearing pressure and the beam mainly bearing bending moment, gives full play to their respective advantages, and has the two characteristics of large span capacity of arch bridge and strong adaptability of simply supported beam bridge to foundation. However, in the construction process, due to the complex construction technology and structural stress behavior, the hoisting of arch rib, the tensioning of tie rod and suspender are accompanied by the change of internal load, which is a challenge for bridge construction. Taking the Lancang River Liming Bridge in Xishuangbanna, Yunnan Province as an example, this paper introduces a new construction scheme of arch bridge, introduces the structural characteristics of cable hoisting system, and puts forward the construction monitoring method. The response of arch rib, suspender, tie rod and main beam is monitored by health monitoring system and compared with the analysis results of finite element model to ensure that the stress and deformation of the structure under various working conditions are in a reasonable state. The results show that the proposed construction scheme can meet the safety and quality requirements of bridge construction, and the finite element model can reasonably predict the bridge behavior in construction. This study is expected to promote the construction of long-span half through steel box tied arch bridge.