http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
허수영(S.Y. Her),김경보(K.B. Kim),허종철(J.C. Huh) 한국전산유체공학회 2010 한국전산유체공학회 학술대회논문집 Vol.2010 No.5
In order to clarify the characteristics of power performance and uncertainty of a wind turbine, an investigation was performed in Hangyeong wind farm, Jeju island, Korea. Data were collected for 12 months from Feb. 2, 2008 to Jan. 1, 2009. This study was conducted on the base of the International standard , and observed the methods of mesurement and evaluation form IEC 61400-12. As a result, power performance curve was calculated by measured data and compared with the sixth unit of VESTAS V90-3.0MW in Hangyeong wind farms. In consequence of this paper, uncertainty was estimated from 7% to 14% on the range of the average wind speed from 4m/s to 11m/s.