http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
공공일괄사업 실시설계단계의 건설사업관리기반 파트너링모델
송병두(Song Byung-Doo),김종일(Kim Jong-Il),김해곤(Kim Hae-Gon),송종관(Song Jong-Kwan),홍태훈(Hong Tae-Hoon),현창택(Hyun Chang-Taek),구교진(Koo Kyo-Jin) 대한건축학회 2007 대한건축학회논문집 Vol.23 No.12
Construction documents stage is very important stage which affect a project success or failure in design-build, however, there have numerous disputes between owners and design-builder. After review of design development, an owner and a construction manager request increase material quality and change floor plans or a site plan, however, a contractor is unwilling to change design documents without offset alternatives against cost increased by that request. This research has been drawn the main obstruction factors from arisen problem and claim cases in construction documents stage in design-build projects and presents considerations of substance of RFP (Request of Proposals), application of partnering, and set up fixed date of design development. To prevent disputes between an owner and a design-builder in construction documents stage in design-build, this research presents the new partnering model integrating project and strategic partnering by a construction manager and verify the effectiveness by interviews.