http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
현장 Mock-up의 BIM 기반 시뮬레이션 기법 적용성 분석 연구
장세준(Jang Se-Jun),윤석헌(Yun Seok-Heon),윤준선(Yun Jun-Seon),백준홍(Peak Joon-Hong) 대한건축학회 2007 大韓建築學會論文集 : 構造系 Vol.23 No.10
Construction project is completed through several stages and problems of each stage affect directly not only now but also next. Defect of 2D drawings influence in construction phase, and it make many loss on project. Nowadays we practically use real Mock-up test in construction sites to solve the problems. But it also has many problems which are waste much money and time. Therefore, this study tries to analyze effect that is occurred by appling BIM Mock-up simulation instead of real Mock-up execution. These analysis is conducted by comparing two construction building site. These have same shape but one is made for BIM Mock-up, and another is real Mock-up. Comparison points of view are cost, time and operator‘s satisfaction. It is expect that BIM Mock-up is more effective at low cost and on shorter time.