http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
조재립(Jai Rip Cho) 한국품질경영학회 2001 품질혁신 Vol.2 No.2
This paper is focused on recognizing the environment potential in the atomsphere and providing the basic requirements on application of environment impact assessment techniques for globle warming. The relationship between trends and environment impact assessment is considered the following three view points: First, the characteristics understanding of environment problems for global warming. Second, the weighted problems which are made from confliction, complementation, long term effectiveness, and different occurrences. Third, the approach difficulties to the problems due to the security and limitations on public properties. The environmental impact assessment techniques are analyzed with the following aspects: The evaluation of the greenhouse effect, the priority on human health, air quality, cooperation between acid rain and smog, international and local governments. It is concluded that to meet the environment problems in present and future, specific environment countermeasures are prepared and environmentally related techniques for greenhouse effect should be developed.
조재립,Cho, Jai-Rip 한국품질경영학회 1995 품질경영학회지 Vol.23 No.4
In recent years, the safety of customers and the demand for rights to be protected from the risk have become stronger than ever day by day, and the function concerning product liability(PL) and quality assurance(QA) has been emphasized. Basically these functions can be obtained by inspection and there is the single rectifying sampling inspection for attribute (KSA-3105) as an existing method. But we can not say this method is good enough because of limitations in the range of applications and the approximate design of inspection methods which can not meet the rapidity and accuracy of quality information transfer according to the maturity of information period. Therefore, in this paper, a new algorithm is developed which can design the accurate inspection method by using the linear cost function that has not been considered in the existing inspection methods. Also in addition to this, a optimal rectifying sampling inspection plan, contributing to minimize the total costs, can be developed by programming the algorithm developed in this study and it can be applied to any field having many processes almost limitlessly.