http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Innovative Nuclear Power Plant Building Arrangement in Consideration of Decommissioning
최원준,노명섭,김창락 한국원자력학회 2017 Nuclear Engineering and Technology Vol.49 No.3
A new concept termed the Innovative Nuclear Power Plant Building Arrangement (INBA)strategy is a new nuclear power plant building arrangement method which encompassesupfront consideration of more efficient decommissioning. Although existing decommissioningstrategies such as immediate dismantling and differed dismantling has theadvantage of either early site restoration or radioactive decommissioning waste reduction,the INBA strategy has the advantages of both strategies. In this research paper, the conceptand the implementation method of the INBA strategy will be described. Two primarybenefits will be further described: (1) early site restoration; and (2) radioactive wastereduction. Several other potential benefits will also be identified. For the estimation ofeconomic benefit, the INBA strategy, with two primary benefits, will be compared with theimmediate dismantling strategy. The effect of a short life cycle nuclear power plant incombination with the INBA strategy will be reviewed. Finally, some of the major impedimentsto the realization of this strategy will be discussed.
Study on Prioritizing the countries for BOT nuclear power project using Analytic Hierarchy Process
최선우,노명섭,Choi, Sun Woo,Bui, Hoang Ha,Roh, Myung Sub The Korean Society of Systems Engineering 2013 시스템엔지니어링학술지 Vol.9 No.2
Developing Build-Own (or Operate)-Transfer (BOT) nuclear power project carrying large capital in the long term requires initially well-made multi-decision which it prevents sorts of risks from unexpected situation of target countries. In order to analyze the feasibility of project country, the Analytic Hierarchy Process is adopted. Firstly, the factors influencing the success of BOT nuclear power project in overseas countries were investigated through the literature survey for the country risk and were evaluated by expert interview for estimating comparative weight through pairwise comparison between such factors. Finally, it is developed comparative database of alternate countries with respect to each factor. This analytic method enables the developer to select and focus on the country which has preferable circumstance so that it enhances the efficiency of the project promotion. Also, it enables the developer to quantify the qualitative factors so that it diversifies the project success strategy and policy for the target country.