        기획·발주, 설계, 건설사업관리 부분의 건설안전관리 향상에 대한 연구

        윤형구,권용준,오병한,권영일,윤영근,오태근,Yoon, H.K.,Kwon, Y.J.,Oh, B.H.,Gwon, Y.I.,Yoon, Y.G.,Oh, Tae Keun 한국안전학회 2020 한국안전학회지 Vol.35 No.4

        The government has established various policies focusing on accident prevention to reduce the accident rate in the construction industry, but the effect is still insignificant. These results allude that there are still many problems in terms of usability. Although construction safety accidents usually have characteristics that occur during construction, the laws and systems should include the pre-construction cycle (plan/order - design - construction business management- construction) to eliminate risk factors in advance. The purpose of this study is to analyze the performance evaluation of the construction safety system before construction rather than during construction. In the pre-construction phase (plan/ order-design-constuction business management), we intend to investigate and analyze measures to prevent safety accidents and identify a system that lacks the ability to implement. Specifically, we analyzed what to focus on as precautionary measures in the planning, ordering, designing, and supervising. To improve them, we made a questionnaire based on the role related to construction safety for each subject, and seek implications for lack of performance through interviews. Based on the results, some ways to improve the safety system were proposed.

      • KCI등재

        교차가새형 선행 안전난간을 적용한 시스템비계의 구조 성능 평가

        박주동,이현섭,신우승,권용준,박순응,양승수,정기효,Park, J.D.,Lee, H.S.,Shin, W.S.,Kwon, Y.J.,Park, S.E.,Yang, S.S.,Jung, K. 한국안전학회 2020 한국안전학회지 Vol.35 No.5

        In domestic construction sites, when installing steel pipe scaffolding and system scaffolding, the guardrails are installed after the installation of the work platforms. This conventional guardrail system (CGS) is always exposed to the risk of falls because the safety railing is installed later. In order to prevent fall disasters during erecting and dismantling scaffolds, it is necessary to introduce the advanced guardrail system (AGS) which installs railings in advance of climbing onto a work platform. For the introduction of the AGS, the structural performance of the system scaffolding applying the CGS and the AGS was compared and evaluated. The structural analysis of the system scaffold (height: 31 m and width: 27.4 m) with AGS confirmed that structural safety was ensured because the maximum stress of each element of the system scaffolding satisfies the allowable stress of each element. As a result of performance comparison of CGS and AGS for each element, the combined stress ratio of vertical posts in AGS was 6.4% lower than that of CGS. In addition, in the case of ledger and transom, the combined stress ratios of AGS and CGS were almost the same. The compression test of the assembled system scaffolding (three-storied, 1 bay) showed that the AGS had better performance than the CGS by 9.7% (8.91 kN). The cross bracing exceeds the limit on slenderness ratio of codes for structural steel design. But the safety factor for the compressive load of the cross bracing was evaluated as meeting the design criteria by securing 3 or more. In actual experiments, it was confirmed that brace buckling did not occur even though the overall scaffold was buckled. Therefore, in the case of temporary structures, it was proposed to revise the standards for limiting on slenderness ratio of secondary or auxiliary elements to recommendations. This study can be used as basic data for the introduction of AGS for installing guardrails in advance at domestic construction sites.

      • KCI등재

        비계작업의 추락재해예방을 위한 선행 안전난간 공법의 도입 타당성 분석

        박주동,문성오,이현섭,정성춘,권용준,정기효,Park, J.D.,Moon, S.O.,Lee, H.S.,Jeong, S.C.,Kwon, Y.J.,Jung, K. 한국안전학회 2020 한국안전학회지 Vol.35 No.4

        In the construction sector, there were 99 fatalities from falls associated with steel tube and system scaffolds for three years from 2016 to 2018 and out of which 27.3 percent (27 workers) were found to have occurred during installing and dismantling procedure. To erect scaffolding which is installed for the work at height, the work platforms are generally installed first and the safety guardrails are installed and vice versa to dismantle. As a result, workers are exposed to the risk of falling because they erect and dismantle scaffolding without guardrails. To minimize the risk of falling, it is necessary to study a new construction method that can erect or dismantle scaffolding while guardrails are installed (called advanced guardrail system). This study analyzed advanced guardrail system in terms of safety regulation, workability and economic efficiency by investigating the domestic situation on the use of scaffolding, reviewing domestic and foreign standards for guardrails and conducting economic feasibility study. The results of this study is expected to greatly contribute to preventing falls in scaffolding installation and dismantlement procedure. As a follow-up study, empirical research is required including physical test of scaffolding with advanced guardrail system and effectiveness analysis after trial applications.