http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Modular BOM을 활용한 와이어링 하네스 원가 산출
임창성(Chang-Sung Im),박훈(Hoon Park),강정태(Jung-Tae Kang) (사)한국CDE학회 2016 한국CDE학회 논문집 Vol.21 No.1
Since past till now, automotive wiring harness has been designed and produced under the method of part number list. However, the number of options has increased gradually on the basis of customer’s needs and car manufacturer’s policy, thereby bringing about an increase in the number of classified parts. Because of a large number of classified parts, cost estimates for manufacturing and production planning are more important than ever. However, the pre-existing manufacturing bill of material abbreviated as BOM is only focused on the list of materials used for actual manufacturing, and as such there have been limits to other fields or areas of usage except for manufacturing. In essence, the present paper is concerned with our study conducted on modular BOM as one of planning BOM. On such basis, we have been able to completely use a method by which to have access, make an option units’ calculation in wiring harness manufacturing, and build an efficient system for cost estimates in manufacturing as well.
Modular BOM을 활용한 와이어링 하네스 원가 산출
임창성(Chang-Sung Im),박훈(Hoon Park),강정태(Jung-Tae Kang) (사)한국CDE학회 2015 한국 CAD/CAM 학회 학술발표회 논문집 Vol.2015 No.하계
Design and production of Automotive wiring harness is following a method by using part number list which is sent from manufacturer up to now. The number of options which are according to Customer`s needs and Car manufacturer`s policy have been increased gradually. For that reason, these caused an increment in classified part numbers. Because of numerous classified part numbers, manufacturing cost estimation and production plan are more important ever. However, existing manufacturing BOM(Bill of Material) is only focused on material list for actual manufacturing, that is why it has limits to use the other field except manufacturing. In this paper, we studied the Modular BOM, one of the Planning BOM. By using our study, We completed a method which could access and calculate by option units in wiring harness manufacturing and built an efficient manufacturing cost estimation system.