http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Cheng-yong Cao,Cheng-hua Shi,Ming-feng Lei,Li-min Peng,Ruxue Bai 대한토목학회 2018 KSCE JOURNAL OF CIVIL ENGINEERING Vol.22 No.8
Hongmian Road goes under Jihe highway by the way of tunnel in Shenzhen City, Guangdong Province, China. The tunnel hassome special characteristics such as shallow depth, large span, soft soil, busy traffic, and long distance under-crossing the operatinghighway, thus there is great difficulty and risk during its construction. A series of in-situ tests were conducted to reveal deformationcharacteristics during tunneling beneath the existing highway by the double-side-drift method (DSDM). The results show that initialconstruction method and measures can't meet the safety requirement of tunnel construction, and the level of risk is extremely high, sothe construction method need to be timely adjusted. By comprehensive analysis, the double-side-drift optimum method (DSDOM) isput forward, on the basis of which a series of optimum measures also have been put forward, such as reasonable constructionmethods, the suitable length of bench and excavation, soil reinforcement measures on tunnel face, optimizing construction process,closing primary support in time and speeding up the construction of secondary lining. Then the feasibility of this optimizedconstruction method and measures are verified by the numerical simulations. Finally, from feedbacks of monitoring results, theoptimum method and measures have been proved to be reasonable and feasible, and they can guarantee a successful pass beneath theoperating highway.