http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
김학범,윤종태 한국정원학회 2002 한국전통조경학회지 Vol.20 No.4
This study is to analyze the meaning and planting pattern of Salix in the Suwon Whasung(Yochunsung). The goal of this study is to investigate the relationship between Salix planting and principles of Korean traditional urbanscape. The methodology of this study is vased on literature review as secondary data research. The literature review explores the publications that were issued in the Li dynasty such as the government official documents, books and painting(including Chosun dynasty chronicles, Whasung Jeondo, Whasung Sungyok Uique, etc.). Throughout the literature review, the following results are found. 1. From the analysis of the old maps, Salix was a main species of street trees in the Suwon Whasung. Especially, the planting from Whahongmun to Whasanruing showned a pattern of a linear function in urbanscape. 2. Salix trees were planted along rivers, streams, creeks and lakes in the Suwon Whasung. These planting patterns explain the relationship between Salix and the urban hydrology system. From this study, we have found are remarkable results which explain a principle of urbanscape formation in the Yi dynasty. The results of this study would contribute to finding the original forms and preserving Suwon Whasung as one of the World Cultural Heritages.
조경분야의 이용후평가 적용모델과 그 가능성에 관한 연구
김학범,장동수,김정태 안성산업대학교 1997 論文集 Vol.29 No.2
The purpose of this study is to present a process model and outline of steps of POE that can be applied to outdoor open space, to review some POEs of urban parks(Yangjae Forest Park, Namsankol Park, and Paris Park) in Seoul Korea, and to offer some suggestions to landscape architects. This paper is organized as follows; The next section reviews the history of papers written about urban park and green space, and finds put the trend and context of some POE papers. Section 3 explains the method and technics of POE survey and purposes a POE process model. Section 4 studies restrains and possibilities in applying POE into landscape architecture by reviewing some POEs of urban parks in Seoul. And last section summarizes the findings of this study and offers some suggestions applying POE into landscape architecture.
김학범,권영민 한경대학교 2003 論文集 Vol.35 No.-
The landscape industry, as a field of construction industry, has made much development together with the desire for the beautiful and pleasant environment according to the enlargement of market size, expansion of its scope of operation and national paradigm shift. It has already been placed as a true independent field with much accumulation of technologies and development of new materials for the while etc. However, the correctness of the drawings in design or construction is still error-prone due to non-principle, vagueness and approach with experience-based decisions, rather than scientific and rational approach. Besides, the propriety and accuracy in the construction field have not even been maintained and trial and error might be involved with waster by each cause. Thus, as design and construction involve various types of discordances, studies on the improvement alternatives for those causes and problems are required. The discordance can be classified into three stages; Stage 1. The cause of discordance and problem first appear. Stage 2. The cause of discordance is eliminated and controlled. Stage 3. Discordance conditions are fixed. This study presents the improvement alternatives through theoretical consideration and case studies for the causes of discordance and the stage where the problems appear. The discordance index from the results of analysis was relatively high as 26.47 on the average for the three sites. As for the analysis of each site by types, the common kind addition-type had the highest percentage with 29.8% and the number change-type was 26.43% from the results. Besides, the results of the analysis of detailed factors are listed from the highest, as construction improvement factor(23.23%), actual condition factor(19.3%) and mutual conflict factor between drawings(14.0%). From the results of the analysis of subjects that involve discordances, constructional factor showed a preponderance(63.27%, while the design factor is 36.73%). At present, the actualized discordance index from the results of the analysis of the potentiality was 20.772(78.46%) and the potential discordance index that remained discordant in the drawings was 5.702(21.54%). The problems that were derived from the results of the analysis could be summarized as the quality problem in the drawings, the problems in the construction process and the problems in the process of the design change, and the improvement alternatives for those problems are as followings; ①First, the paradigm shift of the designers, the precise and thorough inspection of the drawings and the liability system for incomplete designs etc. can be considered, and ②Secondly, the importance of the original drawings is required to be understood, as the responsibility is clarified in case of a change and the improvement of the understanding of each subject is needed, and ③Thirdly, those discordances will be prevented in advance when irrational factors in the process of design change, the stage where discordances are controlled, are improved, and unfair intentions including proposal of changes out of principle, expectation of protection from liability of incomplete designs are restrained.