http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
ESCO Issue - 사업장 배출시설별 적용가능한 온실가스 감축 기술
홍성호,Hong, Seong-Ho 에너지절약전문기업협회 2013 esco Vol.82 No.-
본 문서는 사업장 배출시설별로 적용가능한 온실가스 감축기술에 관한 내용으로 '온실가스 감축기술 1~4'는 <esco>지 81호에서 확인할 수 있다.
홍성호,김종성,Hong, Seong-Ho,Kim, Jong-Seong 대한기계학회 2000 大韓機械學會論文集A Vol.24 No.11
Several methods have been developed to predict the rupture time of the boiler tubes in thermal power plant. However, existing life prediction methods give very conservative value at operating stress of power plant and rupture strain cannot be well estimated. Therefore, in this study, rupture time and strain prediction method accounting for creep, corrosion and heat transfer is newly proposed and compared with the current research results. The creep damage evolves by continuous cavity nucleation and constrained cavity growth. The corrosion damage evolves by steam side and fire side corrosion. The results showed good correlation between the theoretically predicted rupture time and the current research results. And rupture strain may be well estimated by using the proposed method.