http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
임광식(kwang-Sik Lim),이종범(Jong-Boem Lee),정채균(Chae-Kyun Jung),강지원(Ji-Won Kang),박홍석(Hung-Sok Park) 대한전기학회 2008 대한전기학회 학술대회 논문집 Vol.2008 No.11
This paper is analysed by switching overvoltage on operating reclosing in 154[㎸] combined transmission systems. Combined transmission systems are modeled by EMTP/ATPDraw program. It is fault condition that simulate high resistance earth fault. The simulation is carried out considering variation of parameters such as resistance value of fault point and rate of underground line.