http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
시화호 조력발전소 신설에 따른 전력계통 특성 및 경제적 이득 분석
김규호(Kyu-Ho Kim),송경빈(Kyung-Bin Song),김상민(Sang-Min Kim),이성무(Mu-Sung Lee),최홍석(Hong-Seok Choi) 대한전기학회 2012 전기학회논문지 Vol.61 No.6
This paper presents the various analysis of the power system for operating the new SIHWA tidal power plant. In the analysis of the power system, summer load condition of 2011 is used. Especially, power flow, fault current, voltage and contingency of SIHWA tidal power plant area are analyzed by using PSS/E and there is no problem for the dynamic stability simulation. The new SIHWA tidal power plant is located in near metropolitan area where about 43% amount of the system load is consumed. Therefore, transmission losses are reduced. In addition, system marginal price can be lowered by generating the new SIHWA tidal power plant. The generation pattern of the SIHWA tidal plant is analyzed and the changes of generation are presented for various water levels by control of the rotor angle alpha and beta in water wheel generator.