http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
송명준,박영호,유석준,심동현,Song, Myung-Jun,Park, Yung-Ho,Yoo, Seok-Jun,Sim, Dong-Hyun (사)한국토질및기초기술사회 2006 기술발표회 Vol.2006 No.-
The project comprised the construction of the new oil pier and associated topside facilities and demolition of exiting south pier. The site is located approximately 33km south of Kuwait city at MAA refinery. The approach trestle and berth structures of the new oil pier were designed to be supported by steel tubular piles Total 2,480 numbers of piles(795 piles at Approach Trestle, 1187 piles at Berth 1 -4 and 498 piles at Berth 5-6) had to be driven through the calcareous silty sand In this study, the design procedures for offshore steel pipe piles, evaluation for the compression and tension capacities by static and dynamic load test and effective driving criteria by the final set values are discussed