http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
최인규(Inkyu Choi),김종안(Jongan Kim),우주희(Joohee Woo),변승현(Seunghyun Byun),신만수(Mansu Shin) 대한전기학회 2010 대한전기학회 학술대회 논문집 Vol.2010 No.7
The power plants have been large-scaled. The characteristics of the protection systems of large scale power plants are much different from those of small or medium scale power plants for such reasons as that the intermediate pressure steam turbine is used instead of the high pressure steam turbine during startup period. While the protection system of large scale power plant can reduce the start-up time compared to that of small or medium scale power plant, the control algorithm and operation method are very complicated. This paper reviews the turbine protection systems of large scale power plants for stable retrofit of turbine control system.