RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재후보

        서울시내 고등학교 위탁급식의 급식비와 투자비의 실태 및 위탁업체의 기대수준 비교 분석

        양일선,배환미,김현아,신서영,조미나,박수연,차진아,이보숙 한국식생활문화학회 2002 韓國食生活文化學會誌 Vol.17 No.5

        The purposes of this study were to a) find out the operational characteristics of the contract-managed highschool foodservice in Seoul, b) investigate the expected level of meal-price and facilities investment cost perceived by contract-managed highschool foodservice managers c) compare the present level and expected level of meal-price and facilities investment cost. From October 12 to November 13 in 2001, the questionnaires were mailed to 249 high schools which was managed by contract foodservice company with respondent rate 40.2%. Data were analyzed using SPSS Win(10.0) for descriptive analysis and one group paired t-test. The results of this study were as follows ; 1. The student enrollment of highschools run by contract-managed foodservice was 1,243 with 72.6% participation rate of school lunch program. The average meal-price was 2,138 won. The average annual period of school foodservice operation was 156.78 days per year. The average contracting period was about 3 years. 2. The average cost concerned in the facilities investment amounts 169,578,180 won at the initial investment and 25,204,092 won at the repairs and maintenance cost in the course of operation. 3. The present level of meal-price and facilities investment cost were respectively 2,136won/meal and 171,157,336.72 won. And expected level.of meal-price and amount of facilities investment cost were 2,418.75 won and 121,353,215.19 won. Comparing the present level with expected level of the meal-price and facilities investment cost, expected level of meal-price was significantly higher than the present level of meal-price(p<.001) and expected level of facilities investment cost was significantly lower than present level of facilities investment cost(p<.001).

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼