RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      토공작업 정보 인터페이스 개발을 위한 관리속성 분석 및 프로토타입 개발 = Analyzing Attributes and Developing the Prototype for Construction Information Interface In Earthwork Operation

      한글로보기

      https://www.riss.kr/link?id=T14015993

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

      Earthwork is an operation to cut and fill the natural environment of construction sites, and takes a large portion of project budget. The construction vehicles that are put into the operation should be controlled to increase efficiency, productivity, and reduce costs. The objective of this paper is to discuss the attributes and development interface prototype that are required for information interface between construction vehicles during the earthwork operation. This paper 1) discusses the importance of operating construction vehicles for increasing productivity; 2) analyzes the types of attributes that need to be communicated between construction vehicles; 3) shows a database that is built for attributes control; 4) make a prototype that enhance the fuction for communicating and exchanging the information. The database built for information interface between construction vehicles will improve cooperation between construction vehicles, and build a starting point for better management of earthwork construction.
      번역하기

      Earthwork is an operation to cut and fill the natural environment of construction sites, and takes a large portion of project budget. The construction vehicles that are put into the operation should be controlled to increase efficiency, productivity, ...

      Earthwork is an operation to cut and fill the natural environment of construction sites, and takes a large portion of project budget. The construction vehicles that are put into the operation should be controlled to increase efficiency, productivity, and reduce costs. The objective of this paper is to discuss the attributes and development interface prototype that are required for information interface between construction vehicles during the earthwork operation. This paper 1) discusses the importance of operating construction vehicles for increasing productivity; 2) analyzes the types of attributes that need to be communicated between construction vehicles; 3) shows a database that is built for attributes control; 4) make a prototype that enhance the fuction for communicating and exchanging the information. The database built for information interface between construction vehicles will improve cooperation between construction vehicles, and build a starting point for better management of earthwork construction.

      더보기

      목차 (Table of Contents)

      • 제1장 서론 1
      • 1.1 연구의 배경 1
      • 1.2 연구의 목적 3
      • 1.3 연구대상 선정 및 연구방법 4
      • 제2장 국내외 연구 동향 9
      • 제1장 서론 1
      • 1.1 연구의 배경 1
      • 1.2 연구의 목적 3
      • 1.3 연구대상 선정 및 연구방법 4
      • 제2장 국내외 연구 동향 9
      • 2.1 국내 관련연구 9
      • 2.2 국외 관련연구 18
      • 제3장 건설장비 구성 20
      • 3.1 건설장비 운용특성 20
      • 3.2 건설장비 협업체계 25
      • 제4장 건설장비의 관리속성 29
      • 4.1 건설장비 간 정보 인터페이스 29
      • 4.2 건설장비 속성분석 30
      • 제5장 정보 인터페이스 프로토타이핑 36
      • 5.1 건설장비 간 데이터 연계과정 36
      • 5.2 건설장비 관리속성 데이터 모델링 37
      • 5.3 데이터베이스 개발 40
      • 제6장 프로토타이핑 46
      • 제7장 결론 52
      • 감사의 글 54
      • 참고문헌 55
      • Abstract 60
      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼