RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        A Multi-time Scale Source–Load Scheduling Method for Power Systems with Wind Power Considering Typical Industrial Production Processes

        Liang Ning,Zhang Jiangyun,Zheng Feng,Pan Zhengnan 대한전기학회 2024 Journal of Electrical Engineering & Technology Vol.19 No.2

        With the gradual increase in the proportion of renewable energy generation such as wind power, it is necessary to implement low-carbon transformation of thermal power units and fully exploit the capacity of industrial load demand response, so as to achieve carbon peak and carbon neutralization of energy and power. On this basis, a multi-time scale scheduling method considering typical industrial load production processes is proposed in this paper. Firstly, with regard to the source, a comprehensive fexible operation mode of carbon capture power plants is introduced to coordinate with wind power. In the aspect of the load, the production characteristics of two typical industrial users are specifcally considered, and the production models that meet their specifc constraints are established. Secondly, the day-ahead and intra-day two-stage economic dispatch model of source–load coordination is constructed so as to optimize the production plan of typical industrial load and the output of units, while improving the problem of load loss and wind curtailment. Finally, an example analysis is carried out. The results show that the scheduling method proposed in this paper can make use of the scheduling advantages of source–load adjustable resources to realize the economic dispatch of power system.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼