RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • 2004 년부터 2015 년까지 건설프로젝트 단계별 국내 BIM관련 국책과제 동향 분석

        조재현(Jehyun, Cho),이강(Ghang, Lee),김현오(Hyunoh, Kim) (사)한국CDE학회 2015 한국 CAD/CAM 학회 학술발표회 논문집 Vol.2015 No.하계

        This study surveys national research projects in South Korea from 2004 to 2015 related to building information modeling (BIM) and analyzed the trend by project phase. For the analysis, we have collected 136 BIM-related research projects in South Korea from the National science & Technology Information Service (NTIS) website, which provides information about national research and development projects. The research projects were categorized by construction project phase. A keyword analysis has been conducted to understand detailed BIM research areas. The phase analysis shows that over 60 percent of the BIM-related research projects in South Korea focus mainly on the design phase. The keyword analysis shows that a majority of the BIM research projects have been conducted in the areas of ‘decision making support’, ‘automated quality assessment’.

      • 표준공종 분류체계에 따른 국내외 건설 로봇 동향 연구

        김현오(Hyunoh, Kim),이강(Ghang, Lee),조재현(Jehyun, Cho) (사)한국CDE학회 2015 한국 CAD/CAM 학회 학술발표회 논문집 Vol.2015 No.하계

        This study surveys the construction robots developed for the past twenty years through literature review and web search. In these two decades, many studies have been conducted in construction automation, and recently, three-dimensional (3D) printing and unmanned aerial vehicles (UAVs) have become new trends. We collected and analyzed 54 cases conducted in the last twenty years in order to technology and development trends. We classified the construction robot research according to the standard construction work classification. In addition, we evaluated development level through comprehensive of four levels: research stage, research completion stage, practical application stage, and commercialization stage. The analyzed results show that only a few projects succeed in commercialization or practical application limited to only three work categories. Eight counts of earth excavators, four counts of reinforced concrete construction, and four counts of steel structure construction work. Moreover, all research cases, which we collected, focused only on the development of the individual robots. In conclusion, the requirements for the development of integrated control systems or coordination systems are encouraged to automation research in terms of leading successful cases.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼