http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
G7 동력차 동력실 유동해석을 통한 루프후드 구조 연구
박광복(Park Kwang-Bok),이동훈(Lee Dong-Hoon),장규호(Jang Kyu-Ho) 한국철도학회 2000 한국철도학회 학술발표대회논문집 Vol.- No.-
The study was carried out about the roof hood structure of power car for Korean High Speed Train. The compatibility for applied material and volume of hood duct was studied using analysis about heat and flow distributions. The materials and volume of duct were mainly determined by output air temperature and flow rate of each electric blocks. This report was described, which focuses on pressure distribution and air temperature within engine compartment of power car.
박광복(Kwang Bok Park) 한국철도학회 2013 한국철도학회 학술발표대회논문집 Vol.2013 No.5
21세기에 들어서면서 정보산업사회의 발달로 삶의 질과 문화수준이 높아지고, 넓은 지역으로 여행하고 싶은 욕망이 커져 장거리 여행객이 나날이 증가하고 있어, 빠르고, 안전한 교통수단이 요구되고 있다. 또한 석유자원의 고갈로 유류가격의 상승으로 인해, 고속전철은 화석연료를 사용하는 항공기와 자동차의 대체 교통수단으로 부상되고 있다. 현재 고속전철은 유럽과 아시아의 많은 국가에서 최고속도 300km/h 전후로 상업운행하고 있다. 아울러 미국, 브라질, 사우디아라비아, 터키, 베트남, 태국, 케냐 등에서도 고속철도의 건설계획 수립하여 활발히 추진하고 있다. 본 고찰에서는 각국에서 운영되고 있는 고속전철의 최고운행속도를 살펴보고, 경쟁속도, 시간단축 효과, 수송 생산성 등을 검토하여, 고속철도 건설이나, 운영계획을 수립하는 철도 관계자에게 도움이 되는 자료를 제공하고자 한다. A speedy and safety transportation is required because long distance travelers are increased with every passing day due to grow up desire feel like traveling to wide area because high quality of life and culture level to growth of information industry society coming to 21<SUP>ST</SUP> country. And the high speed train is rising to the surface to alternative transportation of an airplane and an automobile using fossil fuel due to increase of fuel price dying up petroleum oil resources. The high speed train is commercial operating to maximum operating speed of over and under of 300km/h in many countries of Europe and Asia area. By the way in country of America, Brazil, Saudi Arabia, Turkey, Vietnam, Thailand, Kenya, etc., are driving to provide of construction plan of a high speed railway. In this study would be provided the useful data for engineers, employers and workers on railway field to prepare for construction or operation plan of a high speed railway to check for maximum operating speed, competitive speed, effective of saving journey time, transportation productivity etc., of high speed railway operating in each country.