RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제
      • 좁혀본 항목 보기순서

        • 원문유무
        • 원문제공처
        • 등재정보
        • 학술지명
        • 주제분류
        • 발행연도
        • 작성언어
        • 저자
          펼치기

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • 도시철도역사의 저압선로 및 기기에서의 지락사고 방지 방안에 관한 검토

        민경윤(Min Kyung-Yun),김진호(Kin Jin-Ho),한학수(Han Hag-Su) 한국철도학회 2005 한국철도학회 학술발표대회논문집 Vol.- No.-

        In the station of the railway and the subway various illumination equipment and a general power equipment for a passenger convenience, the signal equipment and the communication equipment which is necessary to the train operation provided. At the all of like this equipment from the electric room which is established in each station by changing from high voltage to low voltage and it supplies from the illumination transformer, the power transformer and the signal transformer. If it supplies to theequipment from the high voltage to the low voltage, it must be established to contact protection device in between the high voltage coil and the low voltage coil. Also it must do the grounding faulting device at the low voltage lines, the earthing devices at apparatus for the protection of an electric shock and an electric fire by the electric relation law. Compared the related regulations between the facilities which require protective functions such as grounding fault or earthing in public utilities like subway stations, and the facilities which do not require line earthing or protective functions such as electricity supplied for signalling the train. Also, will describe a countermeasure for the accident from a grounding fault.

      • 수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구

        민경윤(Min Kyung yun),손영진(Son Yeong Jin),박근수(Park Keun Soo) 한국철도학회 2006 한국철도학회 학술발표대회논문집 Vol.- No.-

        1974. 8.15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9㎞, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basic design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

      • SCOPUSKCI등재
      • 수동 Mode에서 PSD System 최적화 연구

        손영진(Son Young-Jin),민경윤(Min kyung-Yun),이강원(Lee Kang-Won),방연근(bang Yeun-Gun) 한국철도학회 2004 한국철도학회 학술발표대회논문집 Vol.- No.-

        The ascent and descent market screen door (PSD-Platform Screen Door) between the electromotive car which is in the process of operating from the subway ascent and descent market and the passenger it is an immediacy and crisis as the system which it intercepts currently the inside and outside of the country of course signal system automatic operation signal system (ATO) establishment is operated from the segment. Manual operation signal system (the ATS and the ATC) almost it is a condition which is wholly lacking from the segment. This year from second half of the year 2 line manual operation signal system (ATS).It established the shutting tightly elder brother and the railing elder brother in PSD system in segment 12 reverses and the death accident due to the passenger hurt accident which occurs from the subway.It prevented an energy curtailment in the same time when it raises air cooling efficiency, It gathered it restricted the underground space which is comfortable in the use citizen and and and service it did interface the electromotive car and PSD entrance and exit literature course from the manual operation segment to sleep technically optimizationt. It researched a minute dust diffusion.

      • 전력케이블 열화 감시방안에 관한 연구

        한학수(Han Hag-Su),민경윤(Min Kyung-Yun),유기선(Ryu Ki-Son) 한국철도학회 2007 한국철도학회 학술발표대회논문집 Vol.- No.-

        Electric Power cable is the apparatus that receives electric power from the Korea Electric Power Corporation and supplies electric power to electric train and annex facilities of each railway station. With substantial ripple effect during power blackout accidents, such power blackout accidents must be coped with by discriminating the status of insulation deterioration of electric power cable in advance. Discrimination of insulation deterioration of the electric power cable is normally executed while the power is disconnected and it is very difficult to discover, at early stage, the insulation deterioration of the power cable in operational state since the duration of inspection is limited. This research aims to consider method of diagnosing the insulation deterioration of electric power cable in On-Line state rather than diagnosis in Off-Line state in order to secure reliability of power supply by reducing duration of power blackout (accidental blackout and blackout during works) and by seeking reduction in equipment and manpower used in diagnosis of deterioration through prevention of the accident itself prior to occurrence through early restoration of accident due to insulation deterioration of the electric power cable and assessment of performance of the cable under operation.

      • 전차선로 순환전류 발생원인과 대책에 관한 연구

        한학수(Han Hag-Su),민경윤(Min Kyung-Yun) 한국철도학회 2007 한국철도학회 학술발표대회논문집 Vol.- No.-

        Electric car tract plays the role of supply high electric power to the electric car from the substation by using Pantograph of the electric car. It is always exposed to the external atmosphere, which results in quite substantial fluctuations in current and voltage during operation of electric car. This generates possibility of occurrence of accident at all times. Since range of wiring metallic globe installed on the catenary cannot achieve complete electrical contact, accidents are occurring due to circulating current caused by arc caused by incomplete contact due to occurrence of hairline fracture of Pantograph due to pressure or vibration of wiring. Furthermore, rapid increase in the operational current due to increase in the operational frequency of the electric car is causing erosion and short circuit of the metallic globe at the contact points. This study on arc is generated as current transmitted out of the substation courses through power line or wiring metallic globe other than the main circuit as the current is being collected at the electric car through feeder and feeder divergence device. Accordingly, since heat generated by the arc becomes the cause for generation of circulating current due to melting of metal or softening of metal due to increase in temperature accompanying increase in contact resistance, this research shall describe causes and measures against occurrence of circulation current.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼