http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Meng Wang,Xuyang Wang,Yuanhong Sun,Zhimin Gu 대한조선학회 2016 International Journal of Naval Architecture and Oc Vol.8 No.2
To evaluate the tractive performance of tracked trencher on seafloor surface, a new shear stress-displacement empirical model was proposed for saturated soft-plastic soil (SSP model). To validate the SSP model, a test platform, where track segment shear test can be performed in seafloor soil simulacrum (bentonite water mixture), was built. Series shear tests were carried out. Test results indicate that the SSP model can describe the mechanical behavior of track segment with good approximation in seafloor soil simulacrum. Through analyzing the main external forces applied to seafloor tracked trencher during the uniform linear trenching process, a drawbar pull prediction model was deduced with the SSP model. A tracked walking mechanism of the seafloor tracked trencher prototype was built, and verification tests were carried out. Test results indicate that this prediction model was feasible and effective; moreover, from another side, this conclusion also proved that the SSP model was effective.
Wang, Meng,Wang, Xuyang,Sun, Yuanhong,Gu, Zhimin The Society of Naval Architects of Korea 2016 International Journal of Naval Architecture and Oc Vol.8 No.2
To evaluate the tractive performance of tracked trencher on seafloor surface, a new shear stress-displacement empirical model was proposed for saturated soft-plastic soil (SSP model). To validate the SSP model, a test platform, where track segment shear test can be performed in seafloor soil simulacrum (bentonite water mixture), was built. Series shear tests were carried out. Test results indicate that the SSP model can describe the mechanical behavior of track segment with good approximation in seafloor soil simulacrum. Through analyzing the main external forces applied to seafloor tracked trencher during the uniform linear trenching process, a drawbar pull prediction model was deduced with the SSP model. A tracked walking mechanism of the seafloor tracked trencher prototype was built, and verification tests were carried out. Test results indicate that this prediction model was feasible and effective; moreover, from another side, this conclusion also proved that the SSP model was effective.