http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
황운규(U. K. Hwang) 유공압건설기계학회 2015 드라이브·컨트롤 Vol.12 No.2
Research and development of mineral resource related products has progressed with the increased need to develop mineral resources. The DTH hammer is one a resultant product. However, due to particular work conditions of underground drilling, it is difficult to obtain direct data on the DTH Hammer. A DTH drill rig requires a lot of money and time for actual testing. This thesis aimed to resolve this problem by using CAE. First, the structure of the DTH hammer and the movement was analyzed. Next, a standard model based on simulation was proposed and then experimentation and comparison verification was conducted. In addition, the verified models were applied to products of various sizes, and the models used in simulation were compared by conducting field tests.