RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제
      • 좁혀본 항목 보기순서

        • 원문유무
        • 원문제공처
        • 등재정보
        • 학술지명
        • 주제분류
        • 발행연도
        • 작성언어
        • 저자
          펼치기

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        직상류 계측유량경계조건과 분포형모델을 이용한 대규모 다목적댐 홍수유입량 산정

        홍석현,강부식,Hong, Sug-Hyeon,Kang, Boosik 대한토목학회 2015 대한토목학회논문집 Vol.35 No.5

        The inflow estimation at large multipurpose dam reservoir is carried out by considering the water balance among the discharge, the storage change during unit time interval obtained from the observed water level near dam structure and area-volume curve. This method can be ideal for level pool reservoir but include potential errors when the inflow is influenced by the water level slope due to backwater effects from upstream flood inflows and strong wind induced by typhoon. In addition, the other uncertainties arisen from the storage reduction due to sedimentation after the dam construction and water level noise due to mechanical vibration transmitted from the electric power generator. These uncertainties impedes the accurate hydraulic inflow measurement requiring exquisite hydrometric data arrangement for reservoir waterbody. In this study, the distributed hydrologic model using UBC-3P boundary setting was applied and its feasibility was evaluated. Finally, the modeling performance has been verified since the calculated determination coefficient has been in between 0.96 to 0.99 after comparing with observed peak inflow and total inflow at Namgang dam reservoir. 대규모 다목적댐 지점의 유입량 산정은 수위-저수용량곡선에 댐 축에서 측정된 수위를 적용하여 시간당 저수량변화를 계산한 후 방류량을 감안하여 산정하고 있으나, 이 방법은 태풍 등 대규모 홍수 시에는 급격한 유입량 증가로 인한 배수위 및 강한 바람 등의 영향으로 저수지내의 수위가 균일하지 않아 유입량 산정 시 오차 원인이 되고 있다. 이 외에 기존 수위-저수용량 곡선 방법에 의한 유입량 계산 시 문제점인 댐건설 이후 유입 퇴사로 인한 저수용량의 변화, 댐 지점에서의 수위관측의 불균일성 등 다양한 불확실성이 존재하므로 이에 대한 오차 규명이 반드시 필요하다. 본 연구에서는 저수지 유입량 분석시 분포형 강우유출모형을 이용한 UBC-3P 기법을 적용하여 모형의 모의능력을 평가하였다. 최종적으로 기존 유역내 유입량 관측치와 비교한 결과 Peak유량과 Total유량에서 결정계수가 0.82~0.99 사이값을 나타내므로 댐 지점에서의 모형의 적합성을 확인하였다.

      • 산지 소하천에서의 교각세굴심에 관한 실험적 연구

        김이현,홍석현 경복대학 2003 京福論叢 Vol.7 No.-

        현재 국내에서는 매년 교량이 붕괴되거나 심각한 피해를 입고 있다. 이들의 대부분은 홍수시 세굴로 인해 기초지반이 유실됨으로써 발생된다. 따라서 세굴에 의한 피해를 줄이기 위하여는 우선 이에 대한 기초적 연구와 함께 교량설계시 예상되는 세굴깊이를 정확히 산정하고 이를 설계에 합리적으로 반영시키는 것이 필요하다. 본 논문은 신논미교 교각 주위에서의 국부세굴심을 해석하는 모형실험을 기초로 하고 있다. 그리하여 6개의 기존의 국부 세굴심을 산정하는 공식과 HEC-RAS 모형을 이용하여 논미천에 위치한 신논미교에서의 교각설치에 따른 국부 세굴심을 산정하고 수리모형실험을 실시하여 나온 실험값과 서로 비교하여 가장 적합한 세굴공식을 제시하였다. 실험한 결과 수리모형실험한 세굴심이 1.34m가 나왔고, HEC-RAS모형 결과는 2.33m가 나타났다. 또한 기존의 세굴공식들 간에서도 CSU 공식, Shen 공식이 가장 크게 나왔고, Neil 공식과 Qureshi공식이 가장 작은 세굴심값을 나타냈다. 이 중 Breusers 식에 의한 값(1.40m)이 가장 실험값과 유사하게 나와 금번 연구지점인 신논미교에 대해 비교적 적합하다고 판정된다. At present, Korea has been facing the collapsed or damaged bridges every year. Most of these are caused by being washed away by the flood. Therefore, to diminish the damage by scour, above of all, it is necessary to not only compute the expected scour depths for the bridge design along with a fundamental study but also be reflected on the process of the design rationally. This study based on the laboratory works, analyzes local scour depths surrounding New-Nonmi bridge pier. This thesis exhibits a scour equation which suits our plan most by comparing the calculation of local scour depths for a bridge building located in Nonmi stream with the experimental results from a model test utilizing the existing six local scour equations and HEC-RAS Model. The experimental result is as follows. Scour depths by the hydrologic model experiment was 1.34m and HEC-RAS Model was 2.33m. And among the existing scour equations, the results by CSU Eq. and Shen Eq. were the largest values and those by Neil Eq. and Qureshi Eq. had the smallest ones. Of those results, since the value 1.40m estimated by Breusers is turned out to be similar to the experimental value, it is judged that the study of New-Nonmi bridge this time is suited to our purpose relatively.

      • 수공구조물과 통수단면적이 홍수 위에 미치는 영향

        김이현,홍석현 경복대학 2003 京福論叢 Vol.7 No.-

        자연하천에서의 홍수위는 수공구조물과 통수단면적에 의해 많은 영향을 받게 된다. 최근 도시화, 산업화의 급속한 발달로 홍수위가 계획홍수빈도의 상향조정과 교량건설 등으로 인해 증가하는 추세이다. 따라서 본 연구에서는 왕숙천의 일부구간을 대상으로 교량건설로 인한 배수위 상승과 하상준설로 인한 홍수위 하강에 대해 분석해 보았다. 홍수위 분석은 에너지 방법, 운동량평형방법 및 Yarnell방법으로 방법별, 빈도별, 그리고 단면적별로 산정하였다. 홍수위 산정결과 에너지방법과 Yarnell방법은 교량건설 전후에 홍수위에 미치는 영향이 아주 미소하게 나타났고, 운동량평형방법은 너무 과대하게 증가하는 것으로 나타났으며, 계획홍수빈도의 증가에 따라 홍수위도 거의 일정하게 증가하였다. 그리고 통수단면적의 증가에 따라 홍수위는 점점 감소하는 것으로 나타났다. 따라서 교량건설과 하상준설시 홍수위가 증가하지 않는 허용범위 내에서 통수단면적을 충분히 확보할 수 있도록 계획을 수립하여야 할 것으로 사료된다. Flood stage in natural rivers is many influenced by hydraulic structures and conveyance section area. Recently, Flood stage to rapidly develope of city and industrial is a tendency increasing with upward of design flood frequency and bridge construction. Therefore, on the study with object to a reach of the Wangsookcheon Creek was analysis for flood stage. Flood stage analysis was calculated by method, frequency and section area with energy, momentum equilibrium, and Yarnell method. Calculated results of flood stage appeared to minor energy and Yarnell method, very increased with momentum equilibrium method, increased nearly constant with increase of design flood frequency. And flood stage with increase of conveyance section area appeared to gradually decreased. Therefore, flood stage to bridge construction and stream bed dredging operations was thought of could set up plan fully maintain to conveyance section area into allowable limits.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼