http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
이태근 ( Lee Tae Geun ),최홍석 ( Choi Hong Seok ),임대웅 ( Lim Dae Woung ),유연상 ( Yoo Yeon Sang ) 한국구조물진단유지관리공학회 2017 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.21 No.1
The purpose of measuring a dam operated after design & construction is to properly operate reservoir and maintain dam structural safety by comparing the really measured data for the behavior of dam with the data for design & construction, the past mesured data and analyzing them. In this paper, the really measured data is analized for a dam facilitiy located near a seismic epicenter of earthquake that occurred on 12th, Nov. 2016 in Gyeong-ju and the results of safety inspection for a dam is shown by comparing the behavior of dam before and after occuring earthquake.