http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
하지철물 접합부 유격방지 브라켓을 적용한 접합부의 거동에 관한 실험적 연구
김승훈 ( Kim Seung Hun ),백기열 ( Baek Ki Youl ),김성범 ( Kim Seong Beom ),김권식 ( Kim Kown Sik ),홍성욱 ( Hong Seong Uk ) 한국구조물진단유지관리공학회 2017 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.21 No.1
In recent years, non-welded building hardware that can be installed by bolt assembly is used, which does not require fire prevention related materials, fire fighting equipment and personnel. However, there is a need for a method to compensate for the occurrence of buckling at the bolted portion at the time of construction.The purpose of this study is to evaluate the behavior of joints that can control the sliding between members by using anti slip brackets.
하지철물의 브라켓 위치에 따른 접합부 거동에 관한 실험적 연구
김승훈 ( Kim Seung Hun ),백기열 ( Baek Ki Youl ),김성범 ( Kim Seong Beom ),김권식 ( Kim Kown Sik ),홍성욱 ( Hong Seong Uk ) 한국구조물진단유지관리공학회 2017 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.21 No.1
The non-welded building hardware method can reduce accidents caused by welding, and can be constructed by bolt assembly, which can reduce labor costs and shorten the construction period. This study is to compare and verify the performance according to the location where the brackets are joined to the joints using the non-welded building hardware method
무용접 및 용접 하지 골조의 접합부 거동에 관한 실험적 연구
홍성욱 ( Hong Seong-uk ),백기열 ( Baek Ki-youl ),김권식 ( Kim Kown-sik ),김승훈 ( Kim Seung-hun ) 한국구조물진단유지관리공학회 2017 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.21 No.2
The non-welded building hardware method can reduce accidents caused by welding, and can be constructed by bolt assembly, which can reduce labor costs and shorten the construction period. The purpose of this study is to evaluate the behavior of joints of non-welded and welded of building hardware frame
하지철물 각관과 화스너 접합부의 거동에 관한 실험적 연구
홍성욱 ( Hong Seong-uk ),백기열 ( Baek Ki-youl ),김권식 ( Kim Kown-sik ),김승훈 ( Kim Seung-hun ) 한국구조물진단유지관리공학회 2017 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.21 No.2
In recent years, non-welded building hardware that can be installed by bolt assembly is used. However, there is a need for a method to compensate for the occurrence of buckling at the bolted portion at the time of construction. The purpose of this study is to evaluate the behavior of joints between steel square pipe and fastener.