RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        Analysis of multi-coalbed CBM development methods in western Guizhou, China

        Zhaobiao Yang,Yong Qin,Tongsheng Yi,Jun Tang,Zhengguang Zhang,Congcong Wu 한국지질과학협의회 2019 Geosciences Journal Vol.23 No.2

        After more than 20 years of development, the exploration and production of multi-bed coalbed methane in western Guizhou is now in a key growth phase. Based on geological characteristics of CBM and requirements of main development engineering in this area, we have looked into suitable fracturing and drainage modes for this area. This study shows that the Liupanshui coalfield has a high stress field, so staged fracturing with large discharge and high volume of fracturing fluid and sand and increase of the used quantity of high strength ceramic beads is effective for this kind of multi-bed coal reservoir. In contrast, Zhina coalfield has a relatively low stress field, and the Qianbei coalfield has transitional stress conditions. Separate layer fracturing by sleeve diverter in the Zhijin block ensures effective fracturing of multi-production layers. This method enhances fracturing efficiency and decreases fracturing cost and is therefore recommended for the whole area. Coiled tubing fracturing widely used in other countries is recommended for the Zhina and Qianbei coalfields. Commingled drainage and production is considered the best choice for the development of multi-bed CBM reservoirs. The basic geologic conditions for commingled drainage production of multiple layers are that the main productive layers can be ensured to produce gas preferentially and smoothly and the critical desorption pressure liquid level of other productive layers are above the roof depth of the main productive layers. On this basis, all the layers can be produced in an orderly manner by regulating the casing pressure and liquid level depth in different draining phases.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼