RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재후보

        Bus rapid transit – a review

        S.C.Wirasinghe,L. Kattan,M.M. Rahman,J. Hubbell,R. Thilakaratne,S. Anowar 서울시립대학교 도시과학연구원 2013 도시과학국제저널 Vol.17 No.1

        Bus Rapid Transit (BRT) has been demonstrated to provide efficient and effective public transport that can even increase transit ridership and attractiveness within defined urban corridors in both developing and developed countries. The merit of the BRT system lies in its ability to provide a high quality public transit service with limited infrastructure and at a relatively low capital and operating cost. In this paper an attempt is made to review BRT characteristics in some detail. An overview of the elements of BRT systems: the running ways, vehicles, stations, as well as operational control, fare collection and passenger information systems is presented. This paper also discusses how these elements allows BRT services to achieve the speed, capacity, reliability, accessibility and operational safety characteristics that distinguishes such systems from regular express bus services. Each built BRT system is unique and depends on how these basic elements are designed and integrated. Environmental, social and economic impacts, users’ perception and modal shift towards BRT have also been critically reviewed. With the presence of local land use and transport policies that support high-density and mixed developments, BRT has been found to attract potential developments around stations and along its corridor, increasing land values and promoting sustainable development. As reported in the literature, the infrastructure costs vary greatly depending on the costs of land acquisition, station design, degree of separation from traffic, technological features and material, labor costs. Thus, BRT capital costs cannot be generalised and must be transferred carefully based on the changes of the input costs that vary from one place to another. The barriers to BRT that block the achievement of significant success in customer satisfaction and ridership gains are mentioned with specific case studies. The review of BRT indicates that in some cases it has similar performance to higher order public transit; however, it still has its unique characteristics that set it apart.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼