RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        Power System Enhanced Monitoring through Strategic PMU Placement Considering Degree of Criticality of Buses

        Ajeet Kumar Singh,Manoj Fozdar 대한전기학회 2018 Journal of Electrical Engineering & Technology Vol.13 No.5

        This paper proposes a method for optimal placement of Phasor Measurement Units (PMUs) considering system configuration and its attributes during the planning phase of PMU deployment. Each bus of the system is assessed on four diverse attributes; namely, redundancy of measurements, rotor angle and frequency monitoring of generator buses, reactive power deficiency, and maximum loading limit under transmission line outage contingency, and a consolidated ‘degree of criticality’ is determined using Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS). The major contribution of the proposed work is the development of modified objective function which incorporates values of the degree of criticality of buses. The problem is formulated as maximization of the aggregate degree of criticality of the system. The resultant PMU configuration extends complete observability of the system and majority of the PMUs are located on critical buses. As budgetary restrictions on utilities may not allow installation PMUs even at optimal locations in a single phase, multi-horizon deployment of PMUs is also addressed. The proposed approach is tested on IEEE 14-bus, IEEE 30-bus, New England (NE) 39-bus, IEEE 57-bus and IEEE 118-bus systems and compared with some existing methods.

      • SCIESCOPUSKCI등재

        Power System Enhanced Monitoring through Strategic PMU Placement Considering Degree of Criticality of Buses

        Singh, Ajeet Kumar,Fozdar, Manoj The Korean Institute of Electrical Engineers 2018 Journal of Electrical Engineering & Technology Vol.13 No.5

        This paper proposes a method for optimal placement of Phasor Measurement Units (PMUs) considering system configuration and its attributes during the planning phase of PMU deployment. Each bus of the system is assessed on four diverse attributes; namely, redundancy of measurements, rotor angle and frequency monitoring of generator buses, reactive power deficiency, and maximum loading limit under transmission line outage contingency, and a consolidated 'degree of criticality' is determined using Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS). The major contribution of the proposed work is the development of modified objective function which incorporates values of the degree of criticality of buses. The problem is formulated as maximization of the aggregate degree of criticality of the system. The resultant PMU configuration extends complete observability of the system and majority of the PMUs are located on critical buses. As budgetary restrictions on utilities may not allow installation PMUs even at optimal locations in a single phase, multi-horizon deployment of PMUs is also addressed. The proposed approach is tested on IEEE 14-bus, IEEE 30-bus, New England (NE) 39-bus, IEEE 57-bus and IEEE 118-bus systems and compared with some existing methods.

      • KCI등재

        Optimal Placement of Distributed Generators in Radial Distribution System for Reducing the Effect of Islanding

        Narayanan. K,Shahbaz A. Siddiqui,Manoj Fozdar 대한전기학회 2016 Journal of Electrical Engineering & Technology Vol.11 No.3

        The present trend of increasing the penetration levels of Distributed Generator (DG) in the distribution network has made the issue of Islanding crucial for the reliable operation of the network. The islanding, if not detected early may lead to the collapse of the system as it can drive the distribution system to the cascaded failure. In this paper, an extensive study of the effect of DG placement and sizing is performed by dividing the system into different zones to obtain a reduced effect of islanding. The siting and sizing of DG is carried out to improve the overall voltage profile or/and reduction in active power loss using two stage Genetic Algorithm (GA). In the first stage a basic knockout selection is considered and the best population is taken for next stage, where roulette selection for crossover and mutation is performed for optimal placement and sizing of DGs. The effect of the islanding, due to load variations is reduced by optimal siting and sizing of DG. The effectiveness of the proposed scheme is tested on the IEEE 33 and 69 radial bus systems and the results obtained are promising.

      • SCIESCOPUSKCI등재

        Optimal Placement of Distributed Generators in Radial Distribution System for Reducing the Effect of Islanding

        K, Narayanan.,Siddiqui, Shahbaz A.,Fozdar, Manoj The Korean Institute of Electrical Engineers 2016 Journal of Electrical Engineering & Technology Vol.11 No.3

        The present trend of increasing the penetration levels of Distributed Generator (DG) in the distribution network has made the issue of Islanding crucial for the reliable operation of the network. The islanding, if not detected early may lead to the collapse of the system as it can drive the distribution system to the cascaded failure. In this paper, an extensive study of the effect of DG placement and sizing is performed by dividing the system into different zones to obtain a reduced effect of islanding. The siting and sizing of DG is carried out to improve the overall voltage profile or/and reduction in active power loss using two stage Genetic Algorithm (GA). In the first stage a basic knockout selection is considered and the best population is taken for next stage, where roulette selection for crossover and mutation is performed for optimal placement and sizing of DGs. The effect of the islanding, due to load variations is reduced by optimal siting and sizing of DG. The effectiveness of the proposed scheme is tested on the IEEE 33 and 69 radial bus systems and the results obtained are promising.

      • KCI등재

        Preventive and Emergency Control of Power System for Transient Stability Enhancement

        Shahbaz A. Siddiqui,Kusum Verma,K. R. Niazi,Manoj Fozdar 대한전기학회 2015 Journal of Electrical Engineering & Technology Vol.10 No.1

        This paper presents preventive and emergency control measures for on line transient stability (security) enhancement. For insecure operating state, generation rescheduling based on a real power generation shift factor (RPGSF) is proposed as a preventive control measure to bring the system back to secure operating state. For emergency operating state, two emergency control strategies namely generator shedding and load shedding have been developed. The proposed emergency control strategies are based on voltage magnitudes and rotor trajectories data available through Phasor Measurement Units (PMUs) installed in the systems. The effectiveness of the proposed approach has been investigated on IEEE-39 bus test system under different contingency and fault conditions and application results are presented.

      • SCIESCOPUSKCI등재

        Preventive and Emergency Control of Power System for Transient Stability Enhancement

        Siddiqui, Shahbaz A.,Verma, Kusum,Niazi, K.R.,Fozdar, Manoj The Korean Institute of Electrical Engineers 2015 Journal of Electrical Engineering & Technology Vol.10 No.1

        This paper presents preventive and emergency control measures for on line transient stability (security) enhancement. For insecure operating state, generation rescheduling based on a real power generation shift factor (RPGSF) is proposed as a preventive control measure to bring the system back to secure operating state. For emergency operating state, two emergency control strategies namely generator shedding and load shedding have been developed. The proposed emergency control strategies are based on voltage magnitudes and rotor trajectories data available through Phasor Measurement Units (PMUs) installed in the systems. The effectiveness of the proposed approach has been investigated on IEEE-39 bus test system under different contingency and fault conditions and application results are presented.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼