RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        A program for cost estimation of forest road construction using engineer’s method

        Ismael Ghajar,Akbar Najafi,Amir Mohsen Karimimajd,Kevin Boston,Seyed Ali Torabi 한국산림과학회 2013 Forest Science And Technology Vol.9 No.3

        Modeling the cost of road construction is a prerequisite for evaluation and planning of different alternatives for low-volume road networks included in a forest management plan. In this paper, a model for cost estimation of forest roads is presented, based on the standard engineering properties of cross sections and the location-specific parameters of terrain slope and vegetation information. The model assumes six main cost elements of clearing operations, embankment, pavement, grading, culverts and ditch for total construction cost calculation. To validate the performance, the outputs of the model were compared with the experts’ prediction for an existing forest road project in a mountain condition. The final result of the research showed that the model could estimate total cost of road construction in an accuracy range of 6.5%. The results of the validation process showed a 66.51% underestimate for clearing operation, 3.56% underestimate for embankment, 3.85% underestimate for surfacing, 3.32% underestimate for culverts, 20.54% underestimate for ditch excavation, and 22.33% overestimate for grading of the cut slope and travel way. According to the reasonable estimation for total cost, the model could be applied as an evaluation function in finding the optimized layout of a forest road network.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼